Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Plan Scheme Construction Of School Building First Floor For Govt Lp School Chathanoor
|
| Description |
General Plan Scheme Construction Of&Amp#X0d
School Building First Floor For Govt&Amp#X0d
Lp School Chathanoor Kollam
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWD_746987_1 |
|
Reference Number |
PWD/BLDG/TR/21759/2024 |
| Tender Fee | 2760 |
| EMD | 50000 |
| Tender Value | |
| Place | Kollam |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1206515 |
| Start Date | March 06, 2025 22:30 |
| End Date |
Expired
21/03/2025
Expired 487 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Appointment of general consultants for the office of chief administrative officer/ construction, road safety projects, north central railway.
For complete deion and other details, please refer to tender
Read moreDevelopment of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read moreWork regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Work regarding the maintenance and operation for a period of two years of led lights installed by eesl under the madhuban bapudham scheme.
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreGeneral plan scheme construction of school building first floor for govt l p school chathanoorkollam general electrical work
General plan scheme construction of school building first floor for govt l p school chathanoorkollam general electrical work
Read moreGeneral-construction of school building for govt. lp school, kulathummal, kattakada, thiruvananthapuram- ( first floor and second floor) phase ii-providing ei-general electrical work
General-construction of school building for govt. lp school, kulathummal, kattakada, thiruvananthapuram- ( first floor and second floor) phase ii-providing ei-general electrical work
Read moreGeneral-annual plan 2024-25-construction of school building for government lp school peruvamba-electrification of school building for government lp school peruvamba-general electrical work
General-annual plan 2024-25-construction&#x0d of school building for government lp school&#x0d peruvamba-electrification of school building&#x0d for government lp school peruvamba-general&#x0d electrical work
Read moreof your Industry type