Tender Details
Particulars | Details |
---|---|
Title |
Boot Card 486, P/No: Vvl Boot 486 01,Boot Card 386, P/No: Vvl Boot 386 01, I&O L,Pentium 4 Industri
|
Description |
|
Organisation | Department of Defence Production | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 13, 2025 20:00 |
End Date |
03/06/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Boot card-486, p/no: vvl-boot-486-01,boot card-386, p/no: vvl-boot-386-01, i&o l,pentium 4 industri
Read more
Mtc. of road from mancharankobra para to sadioram thakur para via kanta kobra para at abhicharan vc, ward no-4(l-1.70km)/sh wbm-iii, soling, carpeting, seal coat etc.(ch. 0.00km to 0.85km) (gr-i)
Mtc. of road from mancharankobra para to sadioram thakur para via kanta kobra para at abhicharan vc, ward no-4(l-1.70km)/sh wbm-iii, soling, carpeting, seal coat etc.(ch. 0.00km to 0.85km) (gr-i)
Read moreNiet no. 01 of the fy 2025-2026 of the se-i, pmu, wbpwsp(p), phe dte. sl-1
Balance ancillary work for kubirbandh and chakai piped water supply scheme, sonamukhi block, bishnupur sub division under bankura division, phe dte.
Read moreDiesel alternator 12000 hrly routine kit,a,b,c,d,e,f,g,h,i,j,k,l,m,n,o,p,q,r,s,t,u,v,w,x,y,z,aa,ab,
Read more
P f iron railling grating in different area and repair of path from h o rakesh gupta to chandan shop and laxmi niwas to hari mukti niwas and surrounding chamesani temple ward no 4 hatnala mc chamba
P f iron railling grating in different area and repair of path from h o rakesh gupta to chandan shop and laxmi niwas to hari mukti niwas and surrounding chamesani temple ward no 4 hatnala mc chamba
Read moreSpecial repairs of the road from kma road to mathirmia (length 5.913 km) (tr- 04-50) (link no. l-026) under salema block (2nd call) dnit no 01/eo/pmgsy-i (special repair)/trrda/2024-25
Special repair works
Read moreNctps i operation circle o and e division fire fighting overhauling of vertical extended shaft pump erected in sump room no 2 3 4 and 5 of drain oil system in transformer yard
Nctps i operation circle o and e division fire fighting overhauling of vertical extended shaft pump erected in sump room no 2 3 4 and 5 of drain oil system in transformer yard
Read moreFor shiftting of 11 k v, l t line and dtr 1st call. p. a. c. 1996211.00 on electrical sor 01-01-2024, completion period 183 days (i/c rainy season)
For shiftting of 11 k v, l t line and dtr pole with applied accessories from indore road grand jalsa to bairagarh kala railway crossing bhopal. (length 0.6 k m)
Read moreFor shiftting of 11 k v, l t line, dtr 1st call. p. a. c. 1689211.00 on electrical sor 01-01-2024, completion period 183 days (i/c rainy season)
For shiftting of 11 k v, l t line, dtr with applied accessories from village ratanpur pahunch marg bhopal. (length 0.450 k m)
Read moreG e n e r a l 2 0 2 5 2 6 r e p a i r t o
G e n e r a l 2 0 2 5 2 6 r e p a i r t o&#x0d retaining compound wall fixing of sign&#x0d boards at irikkur rest house and purchase ofwashing machine for irikkur and thaliparambarest houses
Read moreof your Industry type