Tender Details
Particulars | Details |
---|---|
Title |
General Budget Work 2021 2022 20 Percentage Upgradation Kottoor Indianoor Road Improvements And Bm And Bc Works To Kottoor Indianoor Road Between Km 0000 To 1300 General Civil Work
|
Description |
General Budget Work 2021 2022 20 Percentage&Amp#X0d
Upgradation Kottoor Indianoor Road &Amp#X0d
Improvements And Bm And Bc Works To&Amp#X0d
Kottoor Indianoor Road Between Km 0000 To&Amp#X0d
1300 General Civil Work&Amp#X0d
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_713285_1 |
Reference Number |
PWD/RB/TR/7333/2022_5_1_1/1 |
Tender Fee | 8270 |
EMD | 1 Lakh |
Tender Value | |
Place | Malappuram |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1123186 |
Start Date | December 06, 2024 17:00 |
End Date |
18/12/2024 ( Expired 148 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Supply and stacking of various materials for special restoration of monsoon damages (2024-25) at various locations between km 31.450 to km 33.906 and km 91.300 to km 130.008 on sairang-tuipuibari road for permanent work and between km 124.086 to km 1
Read moreSurfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreSupply and stacking of crushed stone aggregates of various size and coarse sand for gsb works from km 7.00 to km 20.00 and for pmt works between km 14.00 to km 20.00 on road toong-partem pt- 4685 road under 107 rcc/758 brtf in project swastik in the
Supply and stacking of crushed stone aggregates of various size and coarse sand for gsb works from km 7.00 to km 20.00 and for pmt works between km 14.00 to km 20.00 on road toong-partem pt- 4685 road under 107 rcc/758 brtf in project swastik in the
Read moreDesign, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road
Design, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road
Read moreProtection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Protection work at waterlogging stretches at km14.500 to km. 17.400 (lhs) and km. 14.500 to km. 16.200 (rhs) on 6-lane uer2 nh344 m pkg2 karala kanjhawala road to najafgarh nangloi road km 15.000 to 28.450 in delhi on item rate (percentage) basis.
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreProviding and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 15.00 to km 42.00 at different stretches on road pithoragarh-tawaghat and tack coat with bitumen emulsion over existing surface, correction work w
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 15.00 to km 42.00 at different stretches on road pithoragarh-tawaghat and tack coat with bitumen emulsion over existing surface, correction work w
Read moreAvaneeswaram thalavoor road
General sabarimala festival work 2024 25&#x0d upgradation with bm bc 4 100 km&#x0d improvements by providing bm and bc and&#x0d allied works to avaneeswaram thalavoor road&#x0d km 0 00 to 4 100&#x0d
Read moreGeneral improvement to meppayyur cheruvannur p a n n i m u k k u a v a l a a n d a p p r o a c h t o g u l i k a p u z h a b r i d g e r o a d b w k m 0 000 4 000 and 6 500 9 400 general civil work general civil work
O r m a t i o n w i d e n i n g s i d e p r o t e c t i o n w o r k a n d&#x0d bm and abcd bc concrete culvert and drainage works road safety&#x0d measures&#x0d
Read moreof your Industry type