Tender Details
Particulars | Details |
---|---|
Title |
General Budget Work 2022 2023 20 Percentage Upgradation With Bm And Bc For 1.091 Km Improvements And Providing Bm And Bc Works To Mini Road Soopi Bazar Between Km 0000 To 1091 In Kottakkal
|
Description |
General Budget Work 2022 2023 20 Percentage&Amp#X0d
Upgradation With Bm And Bc For 1.091 Km&Amp#X0d
Improvements And Providing Bm And Bc&Amp#X0d
Works To Mini Road Soopi Bazar Between Km&Amp#X0d
0000 To 1091 In Kottakkal &Amp#X0d
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_755853_1 |
Reference Number |
PWD/RB/TR/12580/2023_5_1_1/1 |
Tender Fee | 5515 |
EMD | 50000 |
Tender Value | |
Place | Malappuram |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1227541 |
Start Date | March 28, 2025 18:00 |
End Date |
05/04/2025 ( Expired 16 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreSpecial repair of various link roads under repair programme 2022 23 2023 24 and 2024 25 from compaction of earth work up to road structure including premix carpet culverts drains and retaining wall etcwith 5year maintance in mc ptk
Special repair of various link roads under repair programme 2022 23 2023 24 and 2024 25 from compaction of earth work up to road structure including premix carpet culverts drains and retaining wall etcwith 5year maintance in mc ptk gr10
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)
Read morePls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp
Pls and c of 75 mm each in two layer wmm 75 mm dbm and 40 mm bc incl cleaning of rd surf and applying pc and tc and road marking wks for surf works bet km 0 pt 000 to km 22 pt 500 on smd rd under 108 rcc 759 brtf rd sector of project deepak in hp
Read moreConstr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Constr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Read moreSupply and stacking of crushed stone aggregates of various size and stone dust between km 38.00 to 45.79 on rrk road for gsb works and km 26.00 on rrk road for wmm works and at km 76.00 on rrk for dbm and bc works between km 38.00 to km 45.79 under 1
Supply and stacking of crushed stone aggregates of various size and stone dust between km 38.00 to 45.79 on rrk road for gsb works and km 26.00 on rrk road for wmm works and at km 76.00 on rrk for dbm and bc works between km 38.00 to km 45.79 under 1
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreMaintenance of road from bdv road to nc nagar bazar (l_2 point 75 km) during the year 2025_26_sh_repair of pot holes, wbm iii, carpeting and recarpeting, brick masonry work, road side pucca drain and other ancillary works
Maintenance of road from bdv road to nc nagar bazar (l_2 point 75 km) during the year 2025_26_sh_repair of pot holes, wbm iii, carpeting and recarpeting, brick masonry work, road side pucca drain and other ancillary works
Read moreOverlay and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.360 to km 208.600 in uttar pradesh n uttarakhand on item rate (percentage) basis
Overlay and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.360 to km 208.600 in uttar pradesh n uttarakhand on item rate (percentage) basis
Read moreSpecial repair of various link roads under repair programme 2022 23 2023 24 202425 from compaction of earth work up to road structure including premix carpet culverts drains and retaining wall etc in market committee distt pathankot. gr7
Special repair of various link roads under repair programme 2022 23 2023 24 202425 from compaction of earth work up to road structure including premix carpet culverts drains and retaining wall etc in market committee distt pathankot. gr7
Read moreof your Industry type