Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Modification To The Existing Ohe In Connection With The Construction Of Rob At Km. 68/1 2 In Kyn Igp Section Of Mumbai Division Of Central Railway
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78590348 |
|
Reference Number |
KYNLD-585-W-743-ContR1De |
| Tender Fee | 0 |
| EMD | 2 Lakh |
| Tender Value | |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78590348/viewNitPdf_4780938.pdf |
| Start Date | November 21, 2024 21:12 |
| End Date |
Expired
23/12/2024
Expired 550 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Hyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreSupervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb
Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreRestoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreStrengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp
Strengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreof your Industry type