| Particulars | Details |
|---|---|
| Title |
A. Dismantling Of Old Pipeline At Main Sump Along With Re Organisation Of Pipes For Dewatering Of Mines (Boq 1 17) B. Re Organization Of Pipeline Along The New Haul Road Towards Crew Main Sump (Boq 18 28) Wrt Konar Ex. Ocp Under Bn K Area.
|
| Description |
A. Dismantling Of Old Pipeline At Main Sump Along With Re Organisation Of Pipes For Dewatering Of Mines (Boq 1 17) B. Re Organization Of Pipeline Along The New Haul Road Towards Crew Main Sump (Boq 18 28) Wrt Konar Ex. Ocp Under Bn K Area.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_303935_3 |
|
Reference Number |
PE(EnM)/AKK OCP/e-tender/23-24/68 |
| Tender Fee | 0 |
| EMD | 6500 |
| Tender Value | - |
| Place | AKKOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=314851 |
| Start Date | March 06, 2024 21:30 |
| End Date |
Expired
11/03/2024
Expired 945 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Re organization including dismantling, laying, jointing and welding of 8inch dia pipeline and shifting of 1000gpm pump for dewatering of main sump w.r.t. konar exp. ocp, bnk area
Re organization including dismantling, laying, jointing and welding of 8inch dia pipeline and shifting of 1000gpm pump for dewatering of main sump w.r.t. konar exp. ocp, bnk area
Read moreRe-organization /repair of water supply pipelines for dust suppression in bunkers of feeder breakers at jrd railway siding of konar exp.ocp, bnk area
Re-organization /repair of water supply pipelines for dust suppression in bunkers of feeder breakers at jrd railway siding of konar exp.ocp, bnk area
Read moreA. reorganization and extension of 3.3kv grade overhead line near main sump (boq 1-14), b. re-organization/dismantling and erection of 220v o/h lighting line at near main sump and near 1951 shovel (boq 15-24) under akkocp, bnk area
A. reorganization and extension of 3.3kv grade overhead line near main sump (boq 1-14), b. re-organization/dismantling and erection of 220v o/h lighting line at near main sump and near 1951 shovel (boq 15-24) under akkocp, bnk area
Read moreFabrication of 5 nos of movable gi sheds for electrical switchgears installed at pumping station of mines wrt konar exp. ocp, bnk area
Fabrication of 5 nos of movable gi sheds for electrical switchgears installed at pumping station of mines wrt konar exp. ocp, bnk area
Read moreA.re-organisation of 8 dia pipeline with dismantling and shifting of 2000gpm pump two times for dewatering near main sump patch to outside of the mine, w.r.t. konar exp.ocp, bnk area, b.re organization extension of 8 dia pipeline and 1000 gpm pump
A.re organisation of 8 dia pipeline with dismantling and shifting of 2000gpm pump two times for dewatering near main sump patch to outside of the mine, w.r.t. konar exp.ocp, bnk area, b.re organization extension of 8 dia pipeline and 1000 gpm pump
Read moreRe-organization of 02 range m.s/gi/erw pipeline 10 inch and 8 inch respectively in respect of akkocp, bnk area
Re-organization of 02 range m.s/gi/erw pipeline 10 inch and 8 inch respectively in respect of akkocp, bnk area
Read moreRe-organization of 8 inch dia pipeline double range at 6 no sump in respect of aadocm of dhori area
Re-organization of 8 inch dia pipeline double range at 6 no sump in respect of aadocm of dhori area
Read moreFabrication of rain gaurd for pump motor ,er and vcb installed at mines different sump w.r.t konar exp, bnk area
Fabrication of rain gaurd for pump motor ,er and vcb installed at mines different sump w.r.t konar exp, bnk area
Read moreDay to day shifting of existing pumps in main sump along with related accessories wrt aadocm of dhori area
Day to day shifting of existing pumps in main sump along with related accessories wrt aadocm of dhori area
Read moreExtension / re arrangement of discharging point of 10inch and 8inch dia pipeline from crew junction to siltation pit near lambi line w.r.t. konar exp. ocp, bnk area
Extension / re arrangement of discharging point of 10inch and 8inch dia pipeline from crew junction to siltation pit near lambi line w.r.t. konar exp. ocp, bnk area