Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Assistance For Unit Overhauling Works In Different Iph Areas Boiler Area
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2025/R/492302 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | May 27, 2025 16:30 |
| End Date |
Expired
28/05/2025
Expired 464 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
NIYURA TECHNOLOGIES PRIVATE LIMITEDNEXTGENT T TRADING COMPANYGLOBAL LINK TRADERS...
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| BPE 650VA | BPE | BPE 650VA | 2 | ₹ 3216.000 |
| DLINK SWITCH 8 PORT | D-Link | DES-1008C 10/100 Mbps Unmanaged Switch Network Switch | 6 | ₹ 4974.000 |
| RICOH Toner type 1230D Black | RICOH | RICOH Toner type 1230D Black | 5 | ₹ 21905.000 |
| HP 12A Black Original LaserJet Toner Cartridge Q2612AC | hp | HP 12A Black Original LaserJet Toner Cartridge Q2612AC | 10 | ₹ 42650.000 |
| FEVICOL SQUEEZY BOTTLE 200 gm | Fevicol | NAT-FEVICOL SQUEEZY BOTTLE 200 gm -A-I | 300 | ₹ 20250.000 |
| Luminous PC 18042 - 150AH Tubular Battery | LUMINOUS | Luminous PC 18042 - 150AH Tubular Battery with 42* months warrenty | 1 | ₹ 13850.000 |
| Nanochecker 710 | NANOCHECKER 710 | Nanochecker 710 | 1 | ₹ 349000.000 |
| JK | J K | Jk Easy Copier | 300 | ₹ 48897.000 |
| Lotus Eazy Ruled Register Hard Bound 96 Page 180 x 295 mm | LOTUS | Lotus Eazy 96 PAGES | 30 | ₹ 1080.000 |
| jungle boot direct moulded pu sole in pairs | Sk | SK | 13 | ₹ 4550.000 |
| Samsungtonercartridge MLT-D101S | SAMSUNG | MLT-D101S | 20 | ₹ 35900.000 |
| Notebook Computers-Laptop | Lenovo | Lenovo Notebook V110-i3 6th gen processor, 4GB RAM, 1TB HDD, 15.6" ,Win10pro,3 yrs | 5 | ₹ 165000.000 |
| Electronic Weighing Scale - Capacity 20 kg, Accuracy 5 g | PHOENIX | SMART-20 | 9 | ₹ 31500.000 |
| VIM SOAP | Vim | VIM SOAP | 50 | ₹ 1000.000 |
| spectra FS paper | Trident Paper FS | spectra FS 75 gsm | 100 | ₹ 21000.000 |
| COPIER PAPER A4 75 GSM CT | Trident | TRIDENT SPECTRA | 100 | ₹ 17550.000 |
| Bajaj Faratta 500mm Grey Pedestal Fan | BAJAJ | Bajaj Faratta 500mm Grey Pedestal Fan | 2 | ₹ 6599.980 |
| WONDER TAPE 2" 35 MTR TRASPARENT TAPE | wonder | WONDER TAPE 2" 35 MTR TRASPARENT TAPE | 100 | ₹ 2200.000 |
| HP LaserJet Pro P1108 Printer | hp | HP LaserJet Pro P1108 | 2 | ₹ 17600.000 |
| Rubber Gloves | NA | Rubber Gloves | 100 | ₹ 5900.000 |
Periodical special assistance for preventive breakdown electrical maintenance and annual overhauling works of lt switch gear and lt motors in outlying areas of unit 1 to 8 for the year 2026-27 pertaining to ee(ola)e division for the period of one year
Detailed scope of work is mentioned in bid document
Read morePeriodical assistance for the various works of warehouse no 1 2 3 c go down diesel bunk scrap yard cpri bhel stores building and other storage area for a period of 12 months
Periodical assistance for the various works of warehouse no 1,2,3, c-go down, diesel bunk, scrap yard ,cpri, bhel stores building and other storage area for a period of 12 months
Read moreRoutine, breakdown maintenance and assistance for operation of pumps and compressors of dust extraction, dust suppression, dry fog dust suppression and tunnel ventilation system of chp unit no3
Routine, breakdown maintenance and assistance for operation of pumps and compressors of dust extraction, dust suppression, dry fog dust suppression and tunnel ventilation system of chp unit no 3
Read moreElectrification and other works for an additional 30-bed neonatal intensive care unit (nicu) at the shimoga institute of medical sciences
Electrification and other works for an additional 30-bed neonatal intensive care unit (nicu) at the shimoga institute of medical sciences
Read moreRepair/replacement of u/s lt ug cable and connected works for area-i and ii at mil stn talbehat
Repair/replacement of u/s lt ug cable and connected works for area-i and ii at mil stn talbehat
Read moreDg ahilyanagar industrial area. m and r to centralized water supply scheme at ahilyanagar indl. area providing services for photo water meter reading, preparation and distribution of water bills, notices and other misc. works for 2 years period.
Dg ahilyanagar industrial area. m and r to centralized water supply scheme at ahilyanagar indl. area providing services for photo water meter reading, preparation and distribution of water bills, notices and other misc. works for 2 years period.
Read moreUpgrading necessary equipment, carrying out related electrical and mechanical works, and installing cctv cameras at the sewage treatment unit for sewage waste management in kudligi town
Upgrading necessary equipment, carrying out related electrical and mechanical works, and installing cctv cameras at the sewage treatment unit for sewage waste management in kudligi town
Read moreProviding consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Providing consultancy services for preparation of detailed project report (dpr) for the formation of new industrial areas including economic analysis, surveying, layout plan design, preparation of cost estimates, cost structure etc., for the proposed mulwada 4th & 5th phase industrial area, belagavi district. (extent 487acres 39 guntas).
Read moreRoutine collection, loading, transportation and unloading of mill rejects, coal (dry or wet), clearing of coal from feeder floor during calibration of mill, hfo unloading and miscellaneous works of unit 1,2 & 3 for a period of one year
Routine collection, loading, transportation and unloading of mill rejects, coal (dry or wet), clearing of coal from feeder floor during calibration of mill, hfo unloading and miscellaneous works of unit 1,2 & 3 for a period of one year
Read moreConstruction of park of sipara mithapur and for renovation of rejuvenation of footpath, boundary wall, guard room, ticket counter, toilet (for male & female) gardening, solar lighting, garden bench, rain water harvesting, gazebo, yoga kutter, gym equipments, and other works in ward no.-30 of kankarbagh circle area, patna nagar nigam patna under amrut 2.0 scheme.
Construction of park of sipara mithapur and for renovation of rejuvenation of footpath, boundary wall, guard room, ticket counter, toilet (for male & female) gardening, solar lighting, garden bench, rain water harvesting, gazebo, yoga kutter, gym equipments, and other works in ward no.-30 of kankarbagh circle area, patna nagar nigam patna under amrut 2.0 scheme.
Read moreof your Industry type