Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚢 Procurement Opportunity: Lift Maintenance Services 🏢 The Ministry Of Railways, Central Government, Invites Bids For A Comprehensive Maintenance Contract For 48 Nos. Lifts Located In The Mumbai Division, Mumbai Cst. 🚤 🗓️ Bid Submission Deadline: April 18, 2024, 1:00 Pm Tender Fee: Inr 5000 Earnest Money Deposit (Emd): Inr 212000 Interested Bidders Must Possess The Requisite Expertise And Infrastructure To Maintain The Specified Lifts Effectively For A Period Of Three Years. Detailed Tender Documents Are Available For Review To Understand The Scope And Requirements Of The Contract. Keywords: Maintenance Contract, Lifts, Ministry Of Railways, Central Government, Mumbai Division, Tender, Bid Submission, Emd| Particulars | Details |
|---|---|
| Title |
Comprehensive Maintenance Contract For 48 Nos. Lifts In Mumbai Division For A Period Of Three Years.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74210285 |
|
Reference Number |
BB-LG-W-DR-2023-13 |
| Tender Fee | 5000 |
| EMD | 2.12 Lakh |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74210285/viewNitPdf_4514364.pdf |
| Start Date | March 19, 2024 16:22 |
| End Date |
Expired
18/04/2024
Expired 866 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Camc of 2 nos of vip lifts & 2 nos of freight lifts of unit 5 to 8 in rtps for a period of one year
Camc of 2 nos of vip lifts & 2 nos of freight lifts of unit 5 to 8 in rtps for a period of one year
Read moreRate contract for hiring of vehicles for official use of karnatak university, dharwad, for a period of two years, as and when required.
Rate contract for hiring of vehicles for official use of karnatak university, dharwad, for a period of two years, as and when required.
Read moreAmc for kenwood make portable handheld wireless sets working at various ocps, chps and departments for a period of 3 years. in division no:corp-mp.
Amc for kenwood make portable handheld wireless sets working at various ocps, chps and departments for a period of 3 years. in division no:corp-mp.
Read moreOutsourcing of services for carrying out scanning and auditing of steel cord conveyor belts working at various chps for a period of two years. in division no:corp-mp.
Outsourcing of services for carrying out scanning and auditing of steel cord conveyor belts working at various chps for a period of two years. in division no:corp-mp.
Read moreOperation maintenance and comprehensive amc for three years for 476 no dwlr system with telemetry as specified in schedule of requirement along with accessories installed at designated locations and data center equipments including replacement of ma
Operation maintenance and comprehensive amc for three years for 476 no dwlr system with telemetry as specified in schedule of requirement along with accessories installed at designated locations and data center equipments including replacement of ma
Read moreComprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years
Comprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreof your Industry type