Tender Details

About Tender

🚢 Procurement Opportunity: Lift Maintenance Services 🏢 The Ministry Of Railways, Central Government, Invites Bids For A Comprehensive Maintenance Contract For 48 Nos. Lifts Located In The Mumbai Division, Mumbai Cst. 🚤 🗓️ Bid Submission Deadline: April 18, 2024, 1:00 Pm Tender Fee: Inr 5000 Earnest Money Deposit (Emd): Inr 212000 Interested Bidders Must Possess The Requisite Expertise And Infrastructure To Maintain The Specified Lifts Effectively For A Period Of Three Years. Detailed Tender Documents Are Available For Review To Understand The Scope And Requirements Of The Contract. Keywords: Maintenance Contract, Lifts, Ministry Of Railways, Central Government, Mumbai Division, Tender, Bid Submission, Emd
Particulars Details
Title
Comprehensive Maintenance Contract For 48 Nos. Lifts In Mumbai Division For A Period Of Three Years.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74210285
Reference
Number
BB-LG-W-DR-2023-13
Tender Fee 5000
EMD 2.12 Lakh
Tender Value -
Place Mumbai CST
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74210285/viewNitPdf_4514364.pdf

Start Date March 19, 2024 16:22
End Date
Expired 18/04/2024

Expired 866 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Camc of 2 nos of vip lifts & 2 nos of freight lifts of unit 5 to 8 in rtps for a period of one year

Camc of 2 nos of vip lifts & 2 nos of freight lifts of unit 5 to 8 in rtps for a period of one year

Read more
Rate contract for hiring of vehicles for official use of karnatak university, dharwad, for a period of two years, as and when required.

Rate contract for hiring of vehicles for official use of karnatak university, dharwad, for a period of two years, as and when required.

Read more
Amc for kenwood make portable handheld wireless sets working at various ocps, chps and departments for a period of 3 years. in division no:corp-mp.

Amc for kenwood make portable handheld wireless sets working at various ocps, chps and departments for a period of 3 years. in division no:corp-mp.

Read more
Outsourcing of services for carrying out scanning and auditing of steel cord conveyor belts working at various chps for a period of two years. in division no:corp-mp.

Outsourcing of services for carrying out scanning and auditing of steel cord conveyor belts working at various chps for a period of two years. in division no:corp-mp.

Read more
Operation maintenance and comprehensive amc for three years for 476 no dwlr system with telemetry as specified in schedule of requirement along with accessories installed at designated locations and data center equipments including replacement of ma

Operation maintenance and comprehensive amc for three years for 476 no dwlr system with telemetry as specified in schedule of requirement along with accessories installed at designated locations and data center equipments including replacement of ma

Read more
Comprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years

Comprehensive maintenance works of administrative building, control room, substation building,pump house,silo office,interim side substation,store room,dozer section,weigh bridge and other service building at rchp under rocp,for a period of two years

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise