Tender Details

Particulars Details
Title
Laying Hdpe Pipeline And In...
Description
Laying Hdpe Pipeline And Installation Of&Amp#X0d Submersible Pumps For Dewatering Surface&Amp#X0d Water In Village Khara Barwala And&Amp#X0d Kishangarh At Rd 225330 Of Hisar Ghaggar&Amp#X0d Multipurpose Channel (Drain)
Organisation Haryana Government | State Govt. and UT
Tender Id 2024_HRY_372166_1
Reference
Number
2024AE671EF6 0440 4DC6 B3FA F7E43D819DD7110IRR
Tender Fee 21180
EMD 10.59 Lakh
Tender Value
Place KHARA BARWALA KISHAN GARH
Link https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=448059
Start Date May 27, 2024 14:30
End Date

12/06/2024 ( Expired 363 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders

Notice inviting expression of interest eoi for registration of radiologist and firms for empanelment in tele radiology reporting panel

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Expression of interest (eoi) from reputed contractors having experience in expressway/ highway/ irrigation/ railway/ metro/ high speed rail/ power sector india/ overseas

Expression of interest (eoi) from reputed &#x0d contractors having experience in expressway/ &#x0d highway/ irrigation/ railway/ metro/ high speed&#x0d rail/ power sector india/ overseas

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Integrated development of chandrika and gs49 project

Offshore installation and onshore works of &#x0d integrated development of chandrika and gs49 project

Read more
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis

Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis

Read more
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis

Read more
Housekeeping and catering services

Housekeeping and catering services at mpsja

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise