Tender Details
Particulars | Details |
---|---|
Title |
B T Renewal Of Tai Approach Road L 3.60 Km Tai To Gunjhaiya 1.90 Km Itori Approach Road 1.70 Km Bamhori Approach Road L 1.00 Km Hinota Approach Road L 0.80 Km Murachh Approach Road L 0.80 Km
|
Description |
B T Renewal Of Tai Approach Road L 3.60 Km Tai To Gunjhaiya 1.90 Km Itori Approach Road 1.70 Km Bamhori Approach Road L 1.00 Km Hinota Approach Road L 0.80 Km Murachh Approach Road L 0.80 Km
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 16534 |
EMD | 2.46 Lakh |
Tender Value | |
Place | Panna Dist |
Link |
AAAAAAAAAA Login to view |
Start Date | May 14, 2025 15:30 |
End Date |
27/05/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreImprovement of road from laljuri to madhab bari l 3 00 km under ridf xxix of nabard job no tp com 180 2023 24 3rd call
Improvement of road from laljuri to madhab bari l 3 00 km under ridf xxix of nabard job no tp com 180 2023 24 3rd call&#x0d
Read moreP and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
P and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
Read moreMtc. of road ing from vip road(near natunnagar grabank) to kataltali-gandhigram road(narayan bhowmik house) and vip road at durjoynagar(near vegetable shops) to hatipara road(l-1.20 km), during the year 2025- 26./sh side berm dressing, wbm-3
Mtc. of road ing from vip road(near natunnagar grabank) to kataltali-gandhigram road(narayan bhowmik house) and vip road at durjoynagar(near vegetable shops) to hatipara road(l-1.20 km), during the year 2025- 26./sh side berm dressing, wbm-3
Read moreConstruction of b.t. road jhadol to phalasiya mukhay marg to shani maharj mandir approach road (6.0 km.)
Construction of b.t. road jhadol to phalasiya mukhay marg to shani maharj mandir approach road (6.0 km.)
Read moreMaintenance of road from tara sundari bandh to basu debnath house during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.60 km)
Maintenance of road from tara sundari bandh to basu debnath house during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.60 km)
Read moreMaintenance of road from sukhu paul house to niranjan debnath house at shani tala during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.60 km)
Maintenance of road from sukhu paul house to niranjan debnath house at shani tala during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.60 km)
Read moreMaintenance of road from suresh debnath land to nh 108b (new) at dakaiya palli during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.50 km)
Maintenance of road from suresh debnath land to nh 108b (new) at dakaiya palli during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.50 km)
Read moreMaintenance of road from mamata rudra paul house to swapan sen house during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.60 km)
Maintenance of road from mamata rudra paul house to swapan sen house during the year 2025-26 / sh wbm-iii, carpeting ,seal coat etc.(l-0.60 km)
Read moreMaintenance of road from manupuri chowmuhani shib mandir to mohinipur via nh 108 b during the year 2025-26 / sh grouting, wbm-iii, carpeting ,seal coat etc.(l-2.80 km) (ch. 0.00 to 1.40 km)/gr-i
Maintenance of road from manupuri chowmuhani shib mandir to mohinipur via nh 108 b during the year 2025-26 / sh grouting, wbm-iii, carpeting ,seal coat etc.(l-2.80 km) (ch. 0.00 to 1.40 km)/gr-i
Read moreof your Industry type