Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Road Marking With Thermoplastic Paint On Km 1 To 7 Of Bilsi Wazirganj Road (Odr) And Km 16 To 20 Of Kachhla Husainpur Sahaswan Road (Odr) In Financial Year 2024 25
|
| Description |
Road Marking With Thermoplastic Paint On Km 1 To 7 Of Bilsi Wazirganj Road (Odr) And Km 16 To 20 Of Kachhla Husainpur Sahaswan Road (Odr) In Financial Year 2024 25
|
| Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
| Tender Id | 2024_CEBLY_937908_1 |
|
Reference Number |
1140(2)/Nivida (E.T)/2024 Date 11.07.2024 |
| Tender Fee | 944 |
| EMD | 1.9 Lakh |
| Tender Value | |
| Place | Budaun |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1634499 |
| Start Date | August 07, 2024 14:30 |
| End Date |
Expired
16/08/2024
Expired 683 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreP and l of hmp ready mix bc 40 mm consolidated incl cleaning of road surface, applying tack coat and correction works with dbm 50 mm incl road marking for resurfacing wks on z-k-l road under 55 rcc/ 762 brtf project vijayak in ladakh region
P and l of hmp ready mix bc 40 mm consolidated incl cleaning of road surface, applying tack coat and correction works with dbm 50 mm incl road marking for resurfacing wks on z-k-l road under 55 rcc/ 762 brtf project vijayak in ladakh region
Read moreImp./dev. of road from h.no.i-1 to i-5, h-1 to h-4 and j-1 to j-7 in aruna nagar by providing rmc in ward no. 73, civil lines, city-sp zone.
Imp./dev. of road from h.no.i-1 to i-5, h-1 to h-4 and j-1 to j-7 in aruna nagar by providing rmc in ward no. 73, civil lines, city-sp zone.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreProviding, laying and compaction of wbm 75 mm thick (in two layers), wbm 100 mm thick, sand blanketing 30 mm thick, ilcb 80 mm thick of m-50 gr concrete and edge block with pcc m 30 gr concrete bet km 44.180 to km 52.000 on lungro gg-damteng-yangts
Providing, laying and compaction of wbm 75 mm thick (in two layers), wbm 100 mm thick, sand blanketing 30 mm thick, ilcb 80 mm thick of m-50 gr concrete and edge block with pcc m 30 gr concrete bet km 44.180 to km 52.000 on lungro gg-damteng-yangts
Read moreImprovement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Improvement of una rampur haroli jaijon road from rampur chowk to jal shakti vibhag rest house, named as vikas path km. 1/700 to 5/700 sh c/o retaining walls, rcc and metal crash barrier, p/l cobble stones and 80mm thick ntc paver in footpath, p/f ca
Read moreRoad marking with thermoplastic paint on km 1 to 7 of bilsi wazirganj road (odr) and km 16 to 20 of kachhla husainpur sahaswan road (odr) in financial year 2024-25.
Road marking with thermoplastic paint on km 1 to 7 of bilsi wazirganj road (odr) and km 16 to 20 of kachhla husainpur sahaswan road (odr) in financial year 2024-25.
Read moreWidening and strengthening of kachhla husainpur sahaswan road (odr) km 1 to 10 in financial year 2024-25
Widening and strengthening of kachhla husainpur sahaswan road (odr) km 1 to 10 in financial year 2024-25
Read moreof your Industry type