Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Pvip Replacing The Damaged Worm And Pinion Of Cross Shutter At Ch.17/716 Km Of Hlc General Mechanical Work
|
| Description |
General Pvip Replacing The Damaged Worm And Pinion Of Cross Shutter At Ch.17/716 Km Of Hlc General Mechanical Work
|
| Organisation | Irrigation Department | State Govt. and UT |
| Tender Id | 2024_Irrig_699553_1 |
|
Reference Number |
IRR/MH/TR/3902/2024_16_1_1/1 |
| Tender Fee | 555 |
| EMD | 1271 |
| Tender Value | - |
| Place | Valayamchirangara |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1147723 |
| Start Date | January 09, 2025 19:25 |
| End Date |
Expired
18/01/2025
Expired 635 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General-iip-replacement of damaged karukutty karayamparambu branch canal shutters and cross regulator shutters at ch.0/000km and baslahem shutter at ch.1/200 km. - general mechanical work
General-iip-replacement of damaged karukutty karayamparambu branch canal shutters and cross regulator shutters at ch.0/000km and baslahem shutter at ch.1/200 km. - general mechanical work
Read moreIip-crds-2025-26-replacing shutters of chalakudy branch canal, kalikkalkkunnu branch canal, aryankala branch canal and cross shutter for chalakudy branch canal at ch.0/800km
Iip-crds-2025-26-replacing shutters of chalakudy branch canal, kalikkalkkunnu branch canal, aryankala branch canal and cross shutter for chalakudy branch canal at ch.0/800km
Read moreGeneral- kodakara branch canal- fabrication, painting and erection of new ms shutter at rbmc ch.31/850km.-general mechanical work
General- kodakara branch canal- fabrication, painting and erection of new ms shutter at rbmc ch.31/850km.-general mechanical work
Read moreGeneral kyip acp plan 2026 27 reconstruction of poolakkadavu surplus shutter at the tail end of kakkodi branch canal and maintenance of thiruvangoor branch canal shutter at ch 0 00 km. general mechanical work
General kyip acp plan 2026 27 reconstruction of poolakkadavu surplus shutter at the tail end of kakkodi branch canal and maintenance of thiruvangoor branch canal shutter at ch 0 00 km. general mechanical work
Read moreMtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Mtps i mill plant ii complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in mills 2a to 2f during aoh
Read moreGeneral-pvip-hlc-annual maintenance of high level canal from ch. 17/716km to 20/000km for the year 2025-26 -general civil work
The provisions includes clearing grass,&#x0d earthwork excavation for silt removal,cutting&#x0d tree stumps ,felling tress and branches etc.
Read moreGeneral-pvip-replacing the old shutter at mathirappilly- fabrication, painting and erection of new shutter-general mechanical work
General-pvip-replacing the old shutter at mathirappilly- fabrication, painting and erection of new shutter-general mechanical work
Read moreGeneral action plan 2023 24 pvip rectification works reconstruction of wingwall and canal lining at breached aquaduct at ch 17/716km of hlc for the year 2023-24-general civil work
Rectification works
Read morePvip-annual maintenance of hlc from ch 06.500 to 12.000km for the year 2023-24
Annual maintenance of hlc from ch 06.500 to 12.000km for the year 2023-24
Read moreGeneral-pvip-clearing blockages-clearing blockage in cross regulators ,syphons, culverts, cut and cover etc.in hlc
The items included in this estimate are earth&#x0d work excavation for removing silt deposited by&#x0d flowing water, labour for removing blockage&#x0d and for water distribution, lumpsum concrete&#x0d for hole filling etc
Read moreof your Industry type