Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏭 Gail (India) Limited Amc Civil Works Opportunity 🛠️ Gail (India) Limited, A Leading Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Maintenance Of Pipeline Installations Under The Underground Maintenance Base At Rp Nhq, Vadodara. 📍 📅 Bid Submission Deadline: May 16, 2024, 2:00 Pm The Scope Of Work Includes Amc Civil Works At Various Locations For A Period Of Two Years. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 5,97,500. Keywords: Gail (India) Limited, Amc Civil Works, Pipeline Maintenance, Underground Maintenance Base, Vadodara, Contractor Bid, Public Sector Undertaking, Tender, Emd| Particulars | Details |
|---|---|
| Title |
Amc Civil Works
|
| Description |
Amc Civil Works At Various Locations Of Pipeline Installations Under Undera Maintenance Base Of Gail Rpnhq Vadodara For A Period Of 02 Years
|
| Organisation | GAIL (India) Limited | Public Sector Undertakings |
| Tender Id | 2024_GAIL_194127_1 |
|
Reference Number |
GAIL/BDA/CNP/AKM/23/W-31 |
| Tender Fee | 0 |
| EMD | 5.98 Lakh |
| Tender Value | - |
| Place | VADODARA |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=212541 |
| Start Date | May 08, 2024 14:30 |
| End Date |
Expired
16/05/2024
Expired 865 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreDesign, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Read moreHiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Hiring of 1 no. of hydraulically operated aerial tower wagon for repairs and maintenance works on electrical lighting poles and oht lines with 12 hours availabilty per day and 1000 kms run per month at section-iv of pkoc,manuguru area for a period of 4 years.-reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreAmc for civil works
Amc for civil works at gail office complex, transit accommodations and gas installations under gail rpnhq, vadodara for a period of 02 years
Read moreof your Industry type