Tender Details

Particulars Details
Title
Wbpwd/Ee/Kpg/Nit12/2024 25
Description
Repairing Potholes With Mending Depression, Jungle Cutting And Drain Clearance In Stretches From 12.80km To14.10km,17.00km To18.50 Km,19.00kmto20.55km...,22.50km To 23.40km And23.85 Kmto24.92km Of Nh 717(a) Pedong Bazar To Lingsay (Rhenock At Sikkim)
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id 2024_WBPWD_746179_1
Reference
Number
WBPWD/EE/KPG/eNIT12/2024-25
Tender Fee 0
EMD 19034
Tender Value
Place Kalimpong
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1649088
Start Date September 07, 2024 16:00
End Date

14/09/2024 ( Expired 297 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Widening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut

Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including

Read more
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.

Read more
Consultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti

Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.

Read more
Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu

Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu

Read more
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise