Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Three Phase Testing Panel For Compressor
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106234025 |
|
Reference Number |
71245001 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Hazipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/032024/106277084/viewNitPdf_4492275.pdf |
| Start Date | February 24, 2024 18:58 |
| End Date |
Expired
12/03/2024
Expired 927 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreProviding security & allied services for stations, viaduct, track and trains in phase-2a sections of bmrcl
Providing security & allied services for stations, viaduct, track and trains in phase-2a sections of bmrcl
Read moreSupply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreRestoration and comprehensive development of fox sagar (phase-i) by the o/o commissioner, hydraa
Restoration and comprehensive development of fox sagar (phase-i) by the o/o commissioner, hydraa
Read moreRestoration and comprehensive development of ameenpur lake (phase-i) by the o/o commissioner, hydraa
Restoration and comprehensive development of ameenpur lake (phase-i) by the o/o commissioner, hydraa
Read moreRestoration and comprehensive development of amber cheruvu (phase - i) by the o/o commissioner, hydraa
Restoration and comprehensive development of amber cheruvu (phase - i) by the o/o commissioner, hydraa
Read moreRestoration and comprehensive development of saroor nagar lake (phase-i) by the o/o commissioner, hydraa
Restoration and comprehensive development of saroor nagar lake (phase-i) by the o/o commissioner, hydraa
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreDesign, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreof your Industry type