Tender Details
Particulars | Details |
---|---|
Title |
Marine Hull All Risk Cover Policy For New Barge And Dredger Situated On The Banks Of Brahmputra River In Sector I Near Water Intake Plant Of Guwahati Refinery
|
Description |
Marine Hull All Risk Cover Policy For New Barge And Dredger Situated On The Banks Of Brahmputra River In Sector I Near Water Intake Plant Of Guwahati Refinery
|
Organisation | IndianOil | Central Govt. Ministry/Department |
Tender Id | 2024_GR_175760_1 |
Reference Number |
GC24FNL021 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Guwahati Refinery, IOCL 781020 |
Link | https://iocletenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=185858 |
Start Date | March 02, 2024 17:30 |
End Date |
18/03/2024 ( Expired 452 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Job 46.2025 hewp mtc. of all hort. works of shrub plant on central verge 2 4 and 5 in sector 14 p ii and sector 33 p i developed urban forest at u e hisar.
Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).
Read moreConstruction of wearing coat on all minor bridges and major bridge at ch. 25.005 on pengainganga river near masalapen two lane road with paved shoulders on nh 461 b from km. 0.00 to 36.845 in the state of maharashtra. (at risk and cost of contractor)
Construction of wearing coat on all minor bridges and major bridge at ch. 25.005 on pengainganga river near masalapen two lane road with paved shoulders on nh 461 b from km. 0.00 to 36.845 in the state of maharashtra. (at risk and cost of contractor)
Read moreMarine hull all risk cover policy for new barge and dredger situated on the banks of brahmputra river in sector i near water intake plant of guwahati refinery for fy 2025-26
Marine hull all risk cover policy for new barge and dredger situated on the banks of brahmputra river in sector i near water intake plant of guwahati refinery for fy 2025-26
Read moreConstruction of seasonal bandh in the river bed of howrah near intake well of 3mgd water treatment plant etc. under dws sub-division no.-i, collegetilla, agartala.
Augmentation of wtp at collegetilla during the year 2024-25. construction of seasonal bandh in the river bed of howrah near intake well of 3mgd water treatment plant etc. under dws sub-division no.-i, collegetilla, agartala.
Read moreDrilling and deve of 1 no. new tube well of size 300mm x 200mm upto 300 mtr. depth or where sufficient quantity of potable water is available complete and all other works contingent thereto in ward no. 9 near press shop (sunny enclave) at kharar
Drilling and deve of 1 no. new tube well of size 300mm x 200mm upto 300 mtr. depth or where sufficient quantity of potable water is available complete and all other works contingent thereto in ward no. 9 near press shop (sunny enclave) at kharar
Read moreProviding and laying of sewer line with 350mm i/d rcc np-3 pipes from hno-1828 to compost plant, sector 17a and connection of storm water drain near main entry sector 17a ,ward-5,under jurisdiction of division-7, mcg.
Providing and laying of sewer line with 350mm i/d rcc np-3 pipes from hno-1828 to compost plant, sector 17a and connection of storm water drain near main entry sector 17a ,ward-5,under jurisdiction of division-7, mcg.
Read moreConstruction of new 4 lane prayagraj southern greenfield by-pass from design km.34.400 (near dandupur) to design km.43.200 (near mahuwari) design length 8.800 km pkg-1 under phase-i on nh-19 in uttar pradesh under bmp on epc mode
Construction of new 4 lane prayagraj southern greenfield by-pass from design km.34.400 (near dandupur) to design km.43.200 (near mahuwari) design length 8.800 km pkg-1 under phase-i on nh-19 in uttar pradesh under bmp on epc mode
Read moreProvision of 3 nos. new tube well bore at sector 18 near bye pass gali no. 6 ahirwada bhoor colony by suitable method prescribed in is 2800 part i in ward no. 29 old faridabad.
Provision of 3 nos. new tube well bore at sector 18 near bye pass gali no. 6 ahirwada bhoor colony by suitable method prescribed in is 2800 part i in ward no. 29 old faridabad.
Read moreConstruction of new 4 lane major bridge with approaches on sabarmati river near dharoi at km. 82/00 to 86/00 (design length 3.300 km) on nh58 in the state of gujarat on ham
Construction of new 4 lane major bridge with approaches on sabarmati river near dharoi at km. 82/00 to 86/00 (design length 3.300 km) on nh58 in the state of gujarat on ham
Read moreProviding laying jointing testing commissioning of900mm (nb) dia d.i ss k9 pipes in raw water rising main from proposed intake well of idco on river mahanadi at phulbari to the water works site at gajamara industrial estate in dhenkanal district
Providing, laying,jointing testing, commissioning of900mm (nb) dia d.i ss k9 pipes in raw water rising main from proposed intake well of idco on river mahanadi at phulbari to the water works site at gajamara industrial estate in dhenkanal district
Read moreof your Industry type