Tender Details
Particulars | Details |
---|---|
Title |
Consultancy Services For Preparation Of Detail Engineering Report For Widening From Two Lane With Paved Shoulder From Km 161/00 To Km 269/260 Nagaur Bikaner Section On Nh 62 Tentative Length 108.260 In The State Of Rajasthan
|
Description |
Consultancy Services For Preparation Of Dpr Report For Widening From Two Lane With Paved Shoulder From Nagaur Bikaner Section On Nh 62 In The State Of Rajasthan
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id | 2024_MoRTH_820033_1 |
Reference Number |
NIT No. 01/2024-25 SE NH BIKANER |
Tender Fee | 10000 |
EMD | 3.19 Lakh |
Tender Value | |
Place | bikaber |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=861807 |
Start Date | August 06, 2024 14:30 |
End Date |
17/09/2024 ( Expired 216 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreConsultancy services for preparation of dpr for four laning of thamaraipatti to t.pudupatti section (madurai ring road phase-ii) from km 29.960 to km 83.170 (length 53.210 km) of nh-744a in the state of tamil nadu
Consultancy services for preparation of dpr for four laning of thamaraipatti to t.pudupatti section (madurai ring road phase-ii) from km 29.960 to km 83.170 (length 53.210 km) of nh-744a in the state of tamil nadu
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreConstruction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreConstruction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab
Read moreof your Industry type