Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Engagement Of User Fee Agency Through E Tender At Harimma Fp At Km 258.555 For Salasar To Nagaur Section Of Nh 65 (New Nh 58) Two Lane With Paved Shoulder From Km 151.141 To Km 270.735 In The State Of Rajasthan
|
| Description |
Engagement Of User Fee Agency Through E Tender At Harimma Fp At Km 258.555 For Salasar To Nagaur Section Of Nh 65 (New Nh 58) Two Lane With Paved Shoulder From Km 151.141 To Km 270.735 In The State Of Rajasthan
|
| Organisation | National Highways Authority of India | Head Office - NHAI | Commercial Operation - NHAI |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 19.97 Crore |
| Place | |
| Link | Login to view |
| Start Date | October 06, 2026 20:30 |
| End Date |
Open
19/10/2026
6 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreCs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Cs for preparation of feasibility study and detailed project report (dpr) of existing 02 lane with paved shoulder into 4 lane with paved shoulder of umariya anuppur (upto mp/chhattisgarh border) (length 160 km approx.) section of nh 43 in mp
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreConsultancy services for preparation of dpr for upgradation to two lanes with paved shoulder of nh-953 from km 0/00 (songarh, junction with nh-53) to km 61.658 (ahwa) in the state of gujarat
Consultancy services for preparation of dpr for upgradation to two lanes with paved shoulder of nh-953 from km 0/00 (songarh, junction with nh-53) to km 61.658 (ahwa) in the state of gujarat
Read moreEngagement of user fee agency on the basis of competitive bidding through e-tender at bathalapalli fp at km 104.405 of nh-42 from km 76/000 to km 99/971 four lane paved shoulder and km 99.971 to km 134.00 of in andhra pradesh
Engagement of user fee agency on the basis of competitive bidding through e-tender at bathalapalli fp at km 104.405 of nh-42 from km 76/000 to km 99/971 four lane paved shoulder and km 99.971 to km 134.00 of in andhra pradesh
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreUpgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreof your Industry type