Tender Details
Particulars | Details |
---|---|
Title |
Laying Of 02 Nos Of New Pipelines Vertically On Ob Benches Towards The North Side Of The Mines From Main Sump At Socp Mines.
|
Description |
Laying Of 02 Nos Of New Pipelines Vertically On Ob Benches Towards The North Side Of The Mines From Main Sump At Socp Mines.
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_MCL_332884_1 |
Reference Number |
MCL/GM/IBV/ENM/etender/112231 Dated.18.03.2025 |
Tender Fee | 0 |
EMD | 14800 |
Tender Value | |
Place | SOCP, IB Valley Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345073 |
Start Date | March 20, 2025 15:30 |
End Date |
02/04/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Road improvement work through construction of side track and hotmix from bhasin traders on mini bypass road in ward-46 via college gate no.-02 to the main gate of ramlila ground.
Road improvement work through construction of side track and hotmix from bhasin traders on mini bypass road in ward-46 via college gate no.-02 to the main gate of ramlila ground.
Read moreAAAAAAAAAA
Login to viewConstruction and installation of common manifold at ohr site and hdd process laying hdpe pipeline from surangapur zone-ii pwss main gate to amtala tricon park, amtala partikabari road with mechanical devices and machinaries required for treanchless
Read moreLaying and fixing of m.s/g.i. pipelines of nominal dia. 6inch, 8inch and 10inch for dewatering monsoon water from sumps of sec.i n sec.ii patches at mines of rajrappa project
Laying and fixing of m.s/g.i. pipelines of nominal dia. 6inch, 8inch and 10inch for dewatering monsoon water from sumps of sec.i n sec.ii patches at mines of rajrappa project.
Read moreDismantling, erection and di of 3.3 kv overhead lines of 02 nos of pump feeders(vcb-4 and ngef-3) from north side of mine to west side of lajkura ocp,ib valley area
Dismantling, erection and di of 3.3 kv overhead lines of 02 nos of pump feeders(vcb-4 and ngef-3) from north side of mine to west side of lajkura ocp,ib valley area
Read moreRelocation of ms,hdpe pipe line of size 8 inch ,10 inch dia from mines sump to north discharge point near kalvat at quarry lajkura ocp, ib valley area
Relocation of ms,hdpe pipe line of size 8 inch ,10 inch dia from mines sump to north discharge point near kalvat at quarry lajkura ocp, ib valley area
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreIoaod engg-development of new a site ro at location within3km from saiha zero point towards lawngtlai on nh-54 dist saiha state mizoram
Ioaod engg-development of new a site ro at location within 3km from saiha zero point towards lawngtlai on nh-54, dist saiha, state mizoram
Read moreConstruction of new a site retail outlet at location on rhs within 10 km from maruti suzuki arena sky automobiles dhamtari towards balod on dhamtari bypass road district dhamtari adv loc 148 state chhattisgarh under raipur divisional office mpso
Construction of new a site retail outlet at location on rhs within 10 km from maruti suzuki arena sky automobiles dhamtari towards balod on dhamtari bypass road district dhamtari adv loc 148 state chhattisgarh under raipur divisional office mpso
Read moreLaying rising main line from 2nd side to hw site of bholardabri wss and construction of different dia valve chamber and restoration of damaged fhtc connection and other allied work at bholardabri pwss under jjm programme under alipurduar division, ph
Laying rising main line from 2nd side to hw site of bholardabri wss and construction of different dia valve chamber and restoration of damaged fhtc connection and other allied work at bholardabri pwss under jjm programme under alipurduar division, ph
Read moreShifting of 04 nos of ht overhead lines from the site of under construction 12.5x3 mva, 33/6.6 kv new substation at utls, ilbl ocp (north), lakhanpur area, mcl
Shifting of 04 nos of ht overhead lines from the site of under construction 12.5x3 mva, 33/6.6 kv new substation at utls, ilbl ocp (north), lakhanpur area, mcl
Read moreof your Industry type