FDR/Mtc. of road from Kalachara to Manirambari via Gardhang (L- 9.50 km) / SH -Patch metalling, re-carpeting seal coat and wire cratesetc. during the year 2024-25. (Portion from 6.200 km to 7.00 km). Group-V
Chief Engineer, PWD (R and B) | State Govt. and UT · SATCHAND
- EMD
- ₹48,537
- Tender fee
- ₹1,000
This tender closed on 17 Sep 2024.
Tender details
- Tender ID
- 2024_CEPWD_52567_1
- Reference number
- 18(4)/PNIeT/EE/PWD/SBM/24-25
- Organisation
- Chief Engineer, PWD (R and B) | State Govt. and UT
- Location
- SATCHAND
- Bids open
- 11 Sep 2024, 9:00 AM
- Bids close
- 17 Sep 2024, 10:00 AM
- Tender value
- –
- EMD
- ₹48,537
- Tender fee
- ₹1,000
Source: https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=pag...
Bid on the next FDR/Mtc. of road from Kalachara tender
Most bids fail on paperwork. Before the next one opens, we'll check your eligibility and get your registrations, digital signature (DSC) and documents ready.
Similar tenders
-
FDR / Mtc. of road from Kalachara to Manirambari via Gardhang (L-9.50 km)
SH- Construction of Boxcell (1m x1.50m), patch metalling, re-carpeting and seal coat etc. during the year 2024-25. (Portion from 3.90 km to 5.40 km). Group- III.(2nd Call)
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Sub-Division Closed 20 Aug 2024
View tender -
FDR/Mtc. of road from Kalachara to Manirambari via Gardhang (L- 9.50 km) / SH-Patch metalling, re-carpeting seal coat and wire cratesetc. during the year 2024-25. (Portion from 5.400km to 6.20 km). Group-IV
Chief Engineer, PWD (R and B) | State Govt. and UT · SATCHAND Closed 17 Sep 2024
View tender -
Mtc of road from kalachara to Manirambari via Gardhang (L-9.50 km) during the year 2024-25
SH- Patch Metalling,Re-carpeting, and seat coat etc.( Portion from 8.480 km to 9.50 km) Gr-II
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Sub-Division Closed 28 Jun 2024
View tender -
Mtc of road from kalachara to Manirambari via Gardhang (L-9.50 km) during the year 2024-25
SH- Patch Metalling,Re-carpeting, and seat coat etc.( Portion from 8.480 km to 9.50 km) Gr-II (3rd Call)
Chief Engineer, PWD (R and B) | State Govt. and UT · Sabroom sub-division Closed 20 Aug 2024
View tender -
Mtc of road from kalachara to Manirambari via Gardhang (L-9.50 km) during the year 2024-25. SH. Patch Metalling,Re-carpeting, and seat coat etc.( Portion from 8.480 km to 9.50 km) Gr-II (2nd Call)
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 29 Jul 2024
View tender -
FDR / Mtc. of road from Kalachara to Manirambari via Gardhang (L- 9.50 km) / SH - Construction of Boxcell (1m x1.50m), patch metalling, re-carpeting and seal coat etc. during the year 2024-25. (Portion from 3.90 km to 5.40 km). Group- III.
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 29 Jul 2024
View tender -
SH - Const. of Boxcell (4m x 4m), wing wall etc. during the year 2024-25
Chief Engineer, PWD (R and B) | State Govt. and UT · SATCHAND Closed 3 Oct 2024
View tender -
FDR/Mtc. of road from kalachara-Maira Road to Twisama via Gardhang Taikumba J.B School (L-1.450 km) during the year 2024-25 / SH - Patch Metalling, Re-carpeting, and seat coat etc
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 17 Sep 2024
View tender -
Mtc / FDR of road from US road (Kalachara) to Kalachara railway station via Bairaghi para (L-0.900km)/ SH. Missing Soling, WBM-III, Carpeting, seal coat and unlined surface drain during the year 2024-25. (Portion from 0.00km to 0.538 km) Gr-I
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 29 Jul 2024
View tender -
FDR/Mtc. of road from Kalachara to Bhuratali Kalibari via Sonamohan para (L-4.20 km) during the year 2024-25/SH- Patch Metalling, Re-carpeting, and seat coat etc. (Portion from 1.960 km to 3.300km) Gr-I.
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 17 Sep 2024
View tender