Mtc / FDR of road from US road (Kalachara) to Kalachara railway station via Bairaghi para (L-0.900km)/ SH. Missing Soling, WBM-III, Carpeting, seal coat and unlined surface drain during the year 2024-25. (Portion from 0.00km to 0.538 km) Gr-I
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand
- EMD
- ₹48,499
- Tender fee
- ₹1,000
This tender closed on 29 Jul 2024.
Tender details
- Tender ID
- 2024_CEPWD_50917_1
- Reference number
- 11(03)/PNIeT/EE/PWD/SBM/24-25
- Organisation
- Chief Engineer, PWD (R and B) | State Govt. and UT
- Location
- Satchand
- Bids open
- 9 Jul 2024, 9:00 AM
- Bids close
- 29 Jul 2024, 10:00 AM
- Tender value
- –
- EMD
- ₹48,499
- Tender fee
- ₹1,000
Source: https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=pag...
Bid on the next mtc / FDR of road from tender
Most bids fail on paperwork. Before the next one opens, we'll check your eligibility and get your registrations, digital signature (DSC) and documents ready.
Similar tenders
-
Mtc /FDR of road from US road (Kalachara) to Kalachara railway station via Bairaghi para (L-0.900km)/ SH- Missing Soling, WBM-III, Carpeting, seal coat and unlined surface drain during the year 2024-25. (from 0.00km to 0.538 km) Gr-I (2nd Call)
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 10 Dec 2024
View tender -
Mtc. of road from Manu-Srinagar road to Bangshi Sardar Para under Kaladhepa VC (L - 2.00 km) / SH - Missing Soling, WBM-III, carpeting, seal coat and unlined surface drain etc.during the year 2024 -25.
(Portion from Ch.1.00 km to Ch.1.560 km) Gr- II (2nd Call).
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 17 Mar 2026
View tender -
Mtc. of road from Kalachara-Maira road to Jharjhari Para(L-2.300km)/ SH- WBM-III, carpeting and seal coat etc.During the year 2024-25. (portion from 0.00km to 0.670 km) Gr-I
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 13 Mar 2025
View tender -
Periodical repair of PWD Road from Radhanagar to Dumrakaridok(L-1.20km) during the year 2025-26/SH Patch WBM-3, Carpeting, unlined surface drains etc. complete Ch. From 0.00km to 1.20km.
Chief Engineer, PWD (R and B) | State Govt. and UT · Mohanpur Closed 14 Jul 2025
View tender -
Mtc. of road from Kalachara-Bhuratali road to Dhanu Chowdhury Para (L-3.150km) / SH- WBM-III, carpeting and seal coat etc. During the year 2024-25. (portion from 0.00km to 0.670 km) Gr-I
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 13 Mar 2025
View tender -
Mtc of road from KF Road to Bilashpur via Dalugaon H.S. School during the year 2023-24 Ch. 0.00km to 1.260km L 1.260 km SH soling, metalling, grouting, carpeting, re-carpeting, sand seal coat, etc.
Chief Engineer, PWD (R and B) | State Govt. and UT · kailashahar Closed 14 Mar 2024
View tender -
Urgent maintenance of PWD Road from Asrai Bazar to Wabwsa Kami(L-2.25km) during the year 2025-26/SH Patch WBM-3, Carpeting, unlined surface drains etc. complete Ch. From 0.00km to 2.25Km.
Chief Engineer, PWD (R and B) | State Govt. and UT · Mohanpur Closed 14 Jul 2025
View tender -
Periodical renewal of PWD Road from Hezamara to Gairing Para (l-2.10km) during the year 2024-25/SH Patch WBM-3, Carpeting, unlined surface drains etc. complete ch from 0.00km to 1.10km./Gr-I
Chief Engineer, PWD (R and B) | State Govt. and UT · Mohanpur Closed 24 Jun 2024
View tender -
Periodical renewal of PWD Road from Dasherghat to Gairing Para(L-1.8km) during the year 2024-25/SH Patch WBM-3, Carpeting, unlined surface drains etc. complete CH. From 0.00km to 0.90km(Gr-I).
Chief Engineer, PWD (R and B) | State Govt. and UT · Mohanpur Closed 2 Jun 2025
View tender -
Periodical renewal of Road from Gairing para to Sanitala bazar (L- 1.78 km)/ SH Carpeting, Patch repairing, Patch Soling , unlined surface drains etc. complete. Ch 0.0 Km to 1.780 Km.excluding
Chief Engineer, PWD (R and B) | State Govt. and UT · Mohanpur Closed 21 Feb 2024
View tender