Tender Details
Particulars | Details |
---|---|
Title |
Tn 61 Work No.01
|
Description |
Tree Plantation And Maintenance (Nurturing Trees For 3 Years ) On Msh And Sh Way Under P.W. Sub Divisision Malegaon / Satana / Deola In The Juridiction Of Executive Engineer, P.W. Division, Malegaon&Amp#X0d
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1107583_1 |
Reference Number |
Tender Notice No. 61 for 2024-2025 |
Tender Fee | 2860 |
EMD | 1.5 Lakh |
Tender Value | |
Place | Malegaon |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1934373 |
Start Date | October 07, 2024 19:40 |
End Date |
12/10/2024 ( Expired 210 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewNotice inviting expression of interest eoi for registration of radiologist and firms for empanelment in tele radiology reporting panel
Read moreCa no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreChartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Read moreSupply of advanced high energy linear accelerator system 01 unit
Supply of advanced high energy linear accelerator system 01 unit for the department of radiation oncology
Read moreAAAAAAAAAA
Login to viewSupply and fitting fixing of main switch, pipe, fittings and other additional electro-mechanical work at ohr site of puncha water supply scheme under purulia mechanical division phe dte.
Read moreCondenser tubes cleaning through bullet shot method during annual oh of unit no.-3 of 3x210mw, atps, anpara
Condenser tubes cleaning through bullet shot method during annual oh of unit no.-3 of 3x210mw, atps, anpara
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreof your Industry type