Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
W 27 Constt. Of Cc Road With Drain From Santosh Rathore To Rakesh Varman
|
| Description |
W 27 Constt. Of Cc Road With Drain From Santosh Rathore To Rakesh Varman
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_UAD_311361_1 |
|
Reference Number |
E-TENDERING/NIRMAN/2023/4467 - 4470 |
| Tender Fee | 2000 |
| EMD | 16800 |
| Tender Value | |
| Place | NAGAR PALIKA BHIND |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | September 25, 2023 16:30 |
| End Date |
Expired
09/10/2023
Expired 1010 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of a drain and road in saurabh nagar located on gram dahtaura road, extending from shri munesh salon to shri vijay kumar pandits house.
Construction of a drain and road in saurabh nagar located on gram dahtaura road, extending from shri munesh salon to shri vijay kumar pandits house.
Read moreCa no.cwe bly/ge (w)/52 of 2026- 2027special repairs to foothpath and allied works from jat annxe to shaheed chowk and krishna road (kr) marge under ge (west) bareilly
Ca no.cwe bly/ge (w)/52 of 2026- 2027special repairs to foothpath and allied works from jat annxe to shaheed chowk and krishna road (kr) marge under ge (west) bareilly
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreW-11 constt. of cc road and drain jagmohan rathore to anil
W-11 constt. of cc road and drain jagmohan rathore to anil
Read moreW-35 constt. of cc road and drain santosh yadav to mehrvan
W-35 constt. of cc road and drain santosh yadav to mehrvan
Read moreW-08 constt. of cc road and drain santosh kushwah to chote
W-08 constt. of cc road and drain santosh kushwah to chote
Read moreW-38 constt. of cc road cc nali ramsevak rathore to kamlesh kumar house
W-38 constt. of cc road cc nali ramsevak rathore to kamlesh kumar house
Read moreof your Industry type