Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Bypass To Titlagarh Town From Km 45.162 To Km 52.678 Including Widening And Strengthening From Single Lane/Double Lane To Double Lane With Paved Shoulder From Km 44.000 To Km 45.162 (Missing Link) Of Nh 59 In The State Of Odisha
|
| Description |
Construction Of Bypass To Titlagarh Town From Km 45.162 To Km 52.678 Including Widening And Strengthening From Single Lane/Double Lane To Double Lane With Paved Shoulder From Km 44.000 To Km 45.162 (Missing Link) Of Nh 59 In The State Of Odisha
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_759286_1 |
|
Reference Number |
22 CE NH of 2023-24 |
| Tender Fee | 11800 |
| EMD | 92.56 Lakh |
| Tender Value | - |
| Place | O/o CE NHs Odisha |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | July 04, 2023 00:25 |
| End Date |
Expired
30/10/2023
Expired 1083 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreConstruction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Construction of 4 lane with paved shoulder daudnagar bypass from km 93.915 to km 102.290 of nh 139 on naubatpur _ hariharganj road in the state of bihar on epc mode.
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreBalance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
Balance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
Read moreConsultancy services for preparation of dpr for rehabilitation and upgradation of existing road between km 0.00 to km 86.00 gangotri to heena from existing/single lane to double lane with paved shoulder specification on gangotri-uttarkashi-dharasu.
Rehabilitation and upgradation of existing road between km 0.00 to km 86.00 gangotri to heena from existing/single lane to double lane with paved shoulder specification on gangotri uttarkashi-dharasu road nh34 in the state of uttarakhand length 86 km
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of dpr for rehabilitation and upgradation of existing road between km 0.00 to km 76.00 bhairoghati nelong naga sonam-pda medikey from existing/single lane to double lane with paved shoulder specification on road
Rehabilitation and upgradation of existing road between km 0.00 to km 76.00 (bhairoghati-nelong-naga-sonam-pda-medikey) from existing/single lane to double lane with paved shoulder specification on road bhairoghati-nelong-naga sonam-pda-medikey secti
Read moreConst. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Read moreof your Industry type