Tender Details
Particulars | Details |
---|---|
Title |
Erection Of 06 Nos Of Above 8 Mtr Pole And 788kg Acsr Conductor 70 Nos Of Disc Insulator 50 Nos Of Pin Insulation And 6 Nos Of Stay In 11 Kv Oh Line From Urimari 33 Kv Sub Sataion To Urimari Officer Colony Bypass In Main 11 Kv Feeder Of Syl D Projec
|
Description |
Erection Of 06 Nos Of Above 8 Mtr Pole An 788kg Acsr Conductor 70 Nos Of Disc Insulator 50 Nos Of Pin Insulation And 6 Nos Of Stay In 11 Kv Oh Line From Urimari 33 Kv Sub Sataion To Urimari Officer Colony Bypass In Main 11 Kv Feeder Of Sayal D Proje
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_298149_1 |
Reference Number |
PE(EnM)/eTender/SYL-D/23-24/42 |
Tender Fee | 0 |
EMD | 8000 |
Tender Value | |
Place | Sayal-D Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=308820 |
Start Date | January 11, 2024 14:30 |
End Date |
20/01/2024 ( Expired 457 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengtheninng 06(six) nos. tilted pole of feeder no. 14 (11kv grade overhead power line) near babhandiha basti.by re-erection of 07 span conductor under govindpur area
Strengtheninng 06(six) nos. tilted pole of feeder no. 14 (11kv grade overhead power line) near babhandiha basti.by re-erection of 07 span conductor under govindpur area
Read moreDismantling /erection of pole with changing of damage stay, pin insulator and conductor of 440 v o/h line from garhi filter pump house to intake well under chp-cpp/ppr.
Dismantling /erection of pole with changing of damage stay, pin insulator and conductor of 440 v o/h line from garhi filter pump house to intake well under chp-cpp/ppr.
Read moreDismantling of a section of 3 wire 11 kv overhead line of bhulan-i feeder from jeenagora kali than to golden sub-station southtisra comprising of 36 nos pole of 12 mtr overhead conductor and erection of 10 nos of pole ( 12 mtr) conductor for extendin
Dismantling of a section of 3 wire 11 kv overhead line of bhulan-i feeder from jeenagora kali than to golden sub-station southtisra comprising of 36 nos pole of 12 mtr overhead conductor and erection of 10 nos of pole ( 12 mtr) conductor for extendin
Read moreErection of 50 nos of pole and 1.8km, 3phase acsr conductor for 3.3kv oh line from 11kv urimari sub-station to birsa project.
Erection of 50 nos of pole and 1.8km, 3phase acsr conductor for 3.3kv oh line from 11kv urimari sub-station to birsa project.
Read moreDismantling of a section of 3 wire 11 kv overhead line of bhulan-i feeder from jeenagora kali than to golden sub-station southtisra comprising of 36 nos pole of 12 mtr overhead conductor and erection of 10 nos of pole ( 12 mtr) conductor for extendin
Dismantling of a section of 3 wire 11 kv overhead line of bhulan-i feeder from jeenagora kali than to golden sub-station southtisra comprising of 36 nos pole of 12 mtr overhead conductor and erection of 10 nos of pole ( 12 mtr) conductor for extendin
Read moreErection of 10 nos. of 11 mtr. pole, 283.68 kg ( 240 m x 3 wire x 394 kg/km) acsr conductor, 6 nos. of stay and
Erection of 10 nos. of 11 mtr. pole, 283.68 kg acsr conductor, 6 nos. of stay and dismantling of 10 nos. of pole and 283.68 kg oh line materials for strengthening and upgradation of 3.3 kv ht o.h line from 11 kv/3.3 kv sub- station of urimari ocp
Read moreConstruction of 11kv oh line with 2 nos dp 11 mtr long wpb pole for heightening of 11kv re-ii feeder of tpcodl for railway works of jagannath ocp site at rakasa, talcher, angul,odisha
Construction of 11kv oh line with 2 nos dp 11 mtr long wpb pole for heightening of 11kv re-ii feeder of tpcodl for railway works of jagannath ocp site at rakasa, talcher, angul,odisha
Read moreDismantling of 3.3kv 3 wire 300 mtrs overhead conductor and 6 nos. tubular pipe pole of ganga feeder from 6 no. sub-station to departmental patch of amal.nt-st-jgc and also erection of 5 no. tubular pipe pole along with 300 mtr 3.3 kv 3 wire overhea
Dismantling of 3.3kv 3 wire 300 mtrs overhead conductor and 6 nos. tubular pipe pole of ganga feeder from 6 no. sub-station to departmental patch of amal.nt-st-jgc and also erection of 5 no. tubular pipe pole along with 300 mtr 3.3 kv 3 wire overhea
Read moreErection of 7 nos.pipe pole and 12 mtr. 3 wire conductor for 3.3 kv ( from 0 seam feeder) for operation of 1000 gpm pump-motor at d-1 departmental patch for de-watering purpose and dismantling of 11 nos h.t. pipe pole and rail pole and 12 mtrs 3 wire
Erection of 7 nos.pipe pole and 12 mtr. 3 wire conductor for 3.3 kv ( from 0 seam feeder) for operation of 1000 gpm pump-motor at d-1 departmental patch for de-watering purpose and dismantling of 11 nos h.t. pipe pole and rail pole and 12 mtrs 3 wire
Read moreErection of 05 nos. above 8 mtr. pole 2675 kg acsr conductor and dismantling of 5 nos. of pole and 2675 kg of oh line material for 440v lt oh line of jamuria madarsa colony and bhanu colony circuit of sayal-d project.
Erection of 05 nos. above 8 mtr. pole 2675 kg acsr conductor and dismantling of 5 nos. of pole and 2675 kg of oh line material for 440v lt oh line of jamuria madarsa colony and bhanu colony circuit of sayal-d project.
Read moreof your Industry type