Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Drying System
|
| Description |
Design, Engineering, Supply, Loading, Transportation, Unloading, Storage, Installation, Testing, And Commissioning Drying System For Copperas Recovery Plant To Remove Surface Moisture Content Of Copperas Crystal
|
| Organisation | Travancore Titanium Products Ltd | State Govt. and UT |
| Tender Id | 2025_TTPL_788644_1 |
|
Reference Number |
PROJ/CRP-DR /KV-12 /2025 -26 |
| Tender Fee | 8850 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | Travancore Titanium Products Ltd, Trivandrum- 21 |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1300754 |
| Start Date | August 22, 2025 19:30 |
| End Date |
Expired
15/09/2025
Expired 381 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreFabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreProviding 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Providing 65 nos. private security guards and 1 no. private security supervisor on outsourcing at s and pc department, rg2 area for a period of 24 months under unit rate system.
Read moreCommissioning drying system
Design, engineering, supply, loading, transportation, unloading, storage, installation, testing, and commissioning drying system for copperas recovery plant to reduce the moisture content of copperas crystals crystals
Read moreof your Industry type