Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cm Urban Infrastructure Development Scheme (I Vth Part)
|
| Description |
Cm Urban Infrastructure Development Scheme (I Vth Part)
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_UAD_312137_1 |
|
Reference Number |
1080/BAROD/2023 |
| Tender Fee | 5000 |
| EMD | 31261 |
| Tender Value | |
| Place | NP BAROD |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | September 27, 2023 16:00 |
| End Date |
Expired
07/10/2023
Expired 992 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of distribution infrastructure of 11 kv feeders&#x0d (urban and industrial) of kheri kalan subdivision, faridabad&#x0d under revamped reformsbased and results-linked, distribution sector scheme.
Read moreAppointment of transaction consultant for master planning, anchor concept development, urban design tourism / integration for the development of aero city at nagapur, varanasi
Appointment of transaction consultant for master planning, anchor concept development, urban design tourism / integration for the development of aero city at nagapur, varanasi
Read moreTourism development work for the ginnaut bagh heritage tree site as part of the development of tourist attractions in lalitpur district.
Tourism development work for the ginnaut bagh heritage tree site as part of the development of tourist attractions in lalitpur district.
Read moreMajor works water supply scheme south tripura replacement 1 deep tube well including drilling development erw pipes pea gravels pump house staging column assembly pipeline reconnection works at ongc gajalia nabagram gp satchand rd block during 26-27
Major works water supply scheme south tripura replacement 1 deep tube well including drilling development erw pipes pea gravels pump house staging column assembly pipeline reconnection works at ongc gajalia nabagram gp satchand rd block during 26-27
Read moreCm urban infrastructure development scheme (ivth part)
Cm urban infrastructure development scheme (ivth part)
Read moreCc road, rcc drain, paver block, retaining wall construction work under cm urban
Cc road, rcc drain, paver block, retaining wall construction work under cm urban&#x0d infra. development scheme phase-iv
Read moreFabrication work of urban water supply scheme kota under distribution sub div ivth kota
Fabrication work of urban water supply scheme kota under distribution sub div ivth kota
Read moreof your Industry type