Tender Details
Particulars | Details |
---|---|
Title |
Rehabilitation And Up Gradation To Two Lane With Paved Shoulder Configuration From Km 67.100 To 67.885, Km 76.100 To 77.060, Km 80.450 To 81.520, Km 82.000 To 82.230, Km 82.400 To 82.610 And Km 96.840 To 98.095 On Balance Length Of 4.51 Km Long Katol
|
Description |
Rehabilitation And Up Gradation To Two Lane With Paved Shoulder Configuration From Km 67.100 To 67.885, Km 76.100 To 77.060, Km 80.450 To 81.520, Km 82.000 To 82.230, Km 82.400 To 82.610 And Km 96.840 To 98.095 On Balance Length Of 4.51 Km Long Katol
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 23600 |
EMD | 1.01 Crore |
Tender Value | |
Place | Katol warud |
Link |
AAAAAAAAAA Login to view |
Start Date | May 29, 2025 15:30 |
End Date |
11/06/2025 ( 44 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDpr and preconstruction activities for rehabilitation and upgradation of forest stretches in sarsam to kothari ch. km 33.000 to km 90.000 and kothari to dhanoda ch. km 90.000 to km 147.650) of nh 161a to 2lps configuration in the state of maharashtra
Dpr and preconstruction activities for rehabilitation and upgradation of forest stretches in sarsam to kothari ch. km 33.000 to km 90.000 and kothari to dhanoda ch. km 90.000 to km 147.650) of nh 161a to 2lps configuration in the state of maharashtra
Read moreDevelop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Develop. of 4lane ac sirhind sehna sec of nh205ag from dak expressway ne5 near malerkotla ch79.200 to junc with lb highway nh754 ad near vill sehna ch.134.290 tl 55.09 km pkgii part of mohali barnala ic in punjab under nh(o) on ham
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreRehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Read moreShort term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Short term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Read moreof your Industry type