Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation And Up Gradation To Two Lane With Paved Shoulder Configuration From Km 67.100 To 67.885, Km 76.100 To 77.060, Km 80.450 To 81.520, Km 82.000 To 82.230, Km 82.400 To 82.610 And Km 96.840 To 98.095 On Balance Length Of 4.51 Km Long Katol
|
| Description |
Rehabilitation And Up Gradation To Two Lane With Paved Shoulder Configuration From Km 67.100 To 67.885, Km 76.100 To 77.060, Km 80.450 To 81.520, Km 82.000 To 82.230, Km 82.400 To 82.610 And Km 96.840 To 98.095 On Balance Length Of 4.51 Km Long Katol
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_858066_1 |
|
Reference Number |
NIT-02/EENH/NGP/2025-26 |
| Tender Fee | 23600 |
| EMD | 1.01 Crore |
| Tender Value | |
| Place | Katol warud |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=902138 |
| Start Date | May 29, 2025 15:30 |
| End Date |
Expired
18/06/2025
Expired 398 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreUp gradation to two four lane with paved shoulder configuration of nh 652 from tuljapur naldurge akkalkot road chainage from km 00.000 to km 30.982 in the state of maharashtra on epc mode length 30.982km
Up gradation to two four lane with paved shoulder configuration of nh 652 from tuljapur naldurge akkalkot road chainage from km 00.000 to km 30.982 in the state of maharashtra on epc mode length 30.982km
Read moreUp-gradation to two lane - four lane with paved shoulder configuration of akabeda to kasturmeta in km 65.600 to 70.453 - 4.760 km of nh-130d (part-3)
Up-gradation to two lane - four lane with paved shoulder configuration of akabeda to kasturmeta in km 65.600 to 70.453 - 4.760 km of nh-130d (part-3)
Read moreUp-gradation to two lane-four lane with paved shoulder configuration of gotajamhari to akabeda in km 58.100 to 65.600 - 7.50 km of nh-130d (part-2)
Up-gradation to two lane-four lane with paved shoulder configuration of gotajamhari to akabeda in km 58.100 to 65.600 - 7.50 km of nh-130d (part-2)
Read moreUp-gradation to two-four lane with paved shoulder configuration akabeda to kasturmeta in km 65.600 to 70.453 - 4.760 km of nh-130d (part-3)
Up-gradation to two-four lane with paved shoulder configuration akabeda to kasturmeta in km 65.600 to 70.453 - 4.760 km of nh-130d (part-3)
Read moreof your Industry type