Tender Details

Particulars Details
Title
Four Laning Of Parwanoo Solan Section Of Nh 22 New Nh 05 From Km 67.00 To 106.139 Under Nhdp Phase Iii On Epc Basis In The State Of H P Reg Maintenance Of Left Out Portion Of Nh 05 Near Saproon Chowk Saproon Gurudwara Road And Handing Over To Hppwd
Description
Providing And Laying Periodical Renewal Coat In Km 101.810 To 102.210 With 40mm Thick Bc Including 10 Percent Dgbm For Profile Correction
Organisation Government of Himachal Pradesh
Tender Id 2023_PWD_82390_1
Reference
Number
5479-5510
Tender Fee 500
EMD 43500
Tender Value -
Place O/O EE NH HPPWD Solan
Link
View Original Tender Notice

https://hptenders.gov.in

Start Date December 07, 2023 21:30
End Date
Expired 22/12/2023

Expired 1030 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
O and m including routine maintenance and incident management of 4 laning of existing 2 lane with paved shoulder road from talwandi bhai to ferozepur on nh-05 (old nh-95) from km 170.000 to km 194.040 in the state of punjab.

O and m including routine maintenance and incident management of 4 laning of existing 2 lane with paved shoulder road from talwandi bhai to ferozepur on nh-05 (old nh-95) from km 170.000 to km 194.040 in the state of punjab.

Read more
4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi

4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi

Read more
Short term maintenance of four laning of parwanoo solan section of nh 22 now nh 05 from km 67000 to km 106139 under nhdp phase iii in the state of himachal pradesh on item rate percentage basis

Short term maintenance of four laning of parwanoo solan section of nh 22 now nh 05 from km 67000 to km 106139 under nhdp phase iii in the state of himachal pradesh on item rate percentage basis

Read more
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis

Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis

Read more
Construction of slope protection work at various locations on the hillside between km 67.000 to km 106.139 of the parwanoo solan section of nh 22 (now nh 5) on epc mode in himachal pradesh

Construction of slope protection work at various locations on the hillside between km 67.000 to km 106.139 of the parwanoo solan section of nh 22 (now nh 5) on epc mode in himachal pradesh

Read more
Pavement works and filling of potholes on parwanoo solan section of nh 22 now nh 5 from km 67.000 to 106.139 on emergent basis in the state of himachal pradesh on item rate percentage basis 2nd call

Pavement works and filling of potholes on parwanoo solan section of nh 22 now nh 5 from km 67.000 to 106.139 on emergent basis in the state of himachal pradesh on item rate percentage basis 2nd call

Read more
Short term operation and maintenance of 4 laning lalgang hanumanha section nh 7 pkg 3 under nhdp ivb in the state of uttar pradesh

Short term operation and maintenance of 4 laning lalgang hanumanha section nh 7 pkg 3 under nhdp ivb in the state of uttar pradesh

Read more
Six laning of walajapet ranipet to tamil nadu andhra pradesh border from km. 106.800 to km. 134.879 of nh 4(new no. nh 40) under nhdp phase-iii in tamil nadu on ham

Six laning of walajapet ranipet to tamil nadu andhra pradesh border from km. 106.800 to km. 134.879 of nh 4(new no. nh 40) under nhdp phase-iii in tamil nadu on ham

Read more
Ie services during o and m period of 4 laning of panikoili keonjher rimuli of nh 20 bot project under nhdp phase iii in the state of odisha

Ie services during o and m period of 4 laning of panikoili keonjher rimuli of nh 20 bot project under nhdp phase iii in the state of odisha

Read more
Balance works for four laning of vikravandi to sethiyathope section (from km 0.0 to km 65.96) of nh-45c in tamil nadu under nhdp phase-iv on epc mode

Balance works for four laning of vikravandi to sethiyathope section (from km 0.0 to km 65.96) of nh-45c in tamil nadu under nhdp phase-iv on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise