Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation And Upgradation Of Badwah Dhamnod Road (Sh 36) Km 0.000 To Km 62.555 From 2 Lane To 4 Lane With Paved Shoulder On Hybrid Annuity Model (Ham) In The State Of Madhya Pradesh (Total Length 62.555 Kms)
|
| Description |
Rehabilitation And Upgradation Of Badwah Dhamnod Road (Sh 36) Km 0.000 To Km 62.555 From 2 Lane To 4 Lane With Paved Shoulder On Hybrid Annuity Model (Ham) In The State Of Madhya Pradesh (Total Length 62.555 Kms)&Amp#X0d
|
| Organisation | Madhya Pradesh Road Development Corporation Limited | State Govt. and UT |
| Tender Id | 2024_DMA_1103485_1 |
|
Reference Number |
700 |
| Tender Fee | 51180 |
| EMD | 11.72 Crore |
| Tender Value | - |
| Place | Badwah |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=588994 |
| Start Date | April 16, 2026 21:00 |
| End Date |
Expired
23/04/2026
Expired 173 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreUpgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreWidening works, development of paved shoulders, junction improvement and development of bus bays for long term rectification of blackspot no. 195 (umariya school) on badwah-dhamnod road under indore division
Widening works, development of paved shoulders, junction improvement and development of bus bays for long term rectification of blackspot no. 195 (umariya school) on badwah-dhamnod road under indore division
Read moreUpgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.
Read moreChambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreof your Industry type