Tender Details

Particulars Details
Title
Construction Of Cc Road And Drain In Abadi Portion Diuriya Link Road Tirahe To Sadhan Wali Gautiya In Distt. Shahjahanpur. (Fin Year 2023 24)
Description
Construction Of Cc Road And Drain In Abadi Portion Diuriya Link Road Tirahe To Sadhan Wali Gautiya In Distt. Shahjahanpur. (Fin Year 2023 24)
Organisation Government of Uttar Pradesh
Tender Id 2023_CEBLY_860206_1
Reference
Number
9865/142C(E-Tender)-3/2023-24 Date 03-11-2023
Tender Fee 2725
EMD 4.73 Lakh
Tender Value
Place SE BLY CIRCLE PWD BLY
Link https://etender.up.nic.in
Start Date November 07, 2023 14:30
End Date

17/11/2023 ( Expired 570 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Selection of epc contractor for chitrakoot link expressway

Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Construction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh

Construction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh

Read more
Construction of cc road and rcc drain at various places in ward no. 05 of nagar parishad bilhara

Construction of cc road and rcc drain at various places in ward no. 05 of nagar parishad bilhara

Read more
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.

Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise