Tender Details

About Tender

🌱 Invitation For Bids: Upgradation/Modernization Of Parks 🌱 The Delhi Development Authority (Dda), Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids From Experienced Contractors For The Upgradation And Modernization Of A 21 Bigha Green Area At Ashok Vihar, Which Includes The Construction Of A Boundary Wall And Other Civil Works As Part Of Vaishnavi Nursery. 📅 Bid Submission Deadline: April 22, 2024, 11:30 Am The Tender Fee Is Set At Inr 114111, With An Earnest Money Deposit (Emd) Of The Same Amount. Interested Bidders Should Submit Detailed Proposals, Including Cost Estimates, Project Timelines, And Compliance With Environmental And Construction Regulations. Keywords: Dda, Parks Upgradation, Modernization, Civil Works, Boundary Wall Construction, Ashok Vihar, Delhi Development Authority, Government Tender, Earnest Money Deposit
Particulars Details
Title
Upgradation /Modernization Of Existing Parks/Green Belts.
Description
Construction Of Boundary Wall And Other Civil Works In 21 Bigha Dda Green Area At Ashok Vihar (Part Of Vaishnavi Nursery).
Organisation Delhi Development Authority | Central Govt. Ministry/Department
Tender Id 2024_DDA_803816_1
Reference
Number
04/EE/HCD-8/DDA/2024-25
Tender Fee 0
EMD 1.14 Lakh
Tender Value
Place Ashok Vihar
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=844901
Start Date April 12, 2024 23:10
End Date

22/04/2024 ( Expired 421 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode

Upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2-lps in the state of madhya pradesh on epc mode

Read more
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh

Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh

Read more
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode

Read more
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line

Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)

Read more
Tower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line

Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route

Read more
Provision of sewage treatment plant and upgradation of sewage lines at alwar mil stn

Provision of sewage treatment plant and upgradation of sewage lines at alwar mil stn

Read more
Design and construction of property development buildings in land parcels at existing mandaveli bus depot and terminus including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works

Design and construction of &#x0d property development buildings in land parcels at existing mandaveli bus &#x0d depot and terminus including civil, architectural finishes, plumbing, e and m, &#x0d hvac, lifts and all associated works

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise