Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Alteration , Remaking And Fabrication Of Motor N Pump Foundation Base Frame For Running 168 Hp, 550 V Motor And Dsm 6 Pump On The Existing Base Frame Including Repairing Of Valves Of Different Sizes And Providing Of Tyre Coupling At Raw Water Side And
|
Description |
Alteration , Remaking And Fabrication Of Motor N Pump Foundation Base Frame For Running 168 Hp, 550 V Motor And Dsm 6 Pump On The Existing Base Frame Including Repairing Of Valves Of Different Sizes And Providing Of Tyre Coupling At Raw Water Side And
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_CCL_287389_3 |
Reference Number |
SO(EnM)/e-tender/23-24/11 |
Tender Fee | |
EMD | 2600 |
Tender Value | |
Place | GM Office, BnK Area |
Link | https://coalindiatenders.nic.in |
Start Date | August 31, 2023 16:30 |
End Date |
11/09/2023 ( Expired 658 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fabrication of 05 coupling 04nos,coupling for 2000gpm and 06 nos,for 1000 gpm pump motor side and pump side of topa project,under kuju area.
Fabrication of 05 coupling 04nos,coupling for 2000gpm and 06 nos,for 1000 gpm pump motor side and pump side of topa project,under kuju area.
Read moreComplete repairing, overhauling, maintenance and onsite commissioning of 2 nos. dsm-3 pump kirloskar make, base plate repairing, tyre coupling, coupling bolt, pump-motor alignment and suction pipeline matching of kurpania and gandhinagar
Complete repairing, overhauling, maintenance and onsite commissioning of 2 nos. dsm-3 pump kirloskar make, base plate repairing, tyre coupling, coupling bolt, pump-motor alignment and suction pipeline matching of kurpania and gandhinagar
Read moreDismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of pump no. 1 and 3 (river side) including making of flange as per required under kathara washery
Dismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of pump no. 1 and 3 (river side) including making of flange as per required under kathara washery
Read moreDismantling of pump from base plate n pipe line and running repairing of dsm -6 pump (1000gpm) (kgw shed) and commissioning the pump wnp, make-kirloskar having punch sl. no. bnk/iwsp/dsm6/kgw/02 on base plate after repair with alignment
Dismantling of pump from base plate n pipe line and running repairing of dsm -6 pump (1000gpm) (kgw shed) and commissioning the pump wnp, make-kirloskar having punch sl. no. bnk/iwsp/dsm6/kgw/02 on base plate after repair with alignment
Read moreComplete repairing/rewinding and overhauling of pullen make 150hp, 550v, 2900rpm submersible motor and 6-stage pump sl. no. dharmabandh/s.s.pump/01 of dharmabandh 2-pit colliery under govindpur area-iii
Complete repairing/rewinding and overhauling of pullen make 150hp, 550v, 2900rpm submersible motor and 6-stage pump sl. no. dharmabandh/s.s.pump/01 of dharmabandh 2-pit colliery under govindpur area-iii
Read moreMaking and fabrication of float pontoons of 60 nos and 40 nos of hdpe drums for installation of pump motor on the pontoons at different sumps and fabrication of cgi sheet shed for fieldswitch and er at bhubaneswari ocp, bhubaneswari area
Making and fabrication of float pontoons of 60 nos and 40 nos of hdpe drums for installation of pump motor on the pontoons at different sumps and fabrication of cgi sheet shed for fieldswitch and er at bhubaneswari ocp, bhubaneswari area
Read moreComplete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area
Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area
Read moreFabrication of base plate /frame for 4000gpm/2000gpm pump motor set at sb workshop(ii) fabrication of foot valve 04 nos. bend 8 nos. short piece sluice valve and n.r valve 4 nos. pump body short piece
For fabrication of base plate /frame for 4000gpm/2000gpm pump motor set at sb workshop(ii) fabrication of foot valve 04 nos. bend 8 nos. short piece sluice valve and n.r valve 4 nos. pump body short piece 8 nos.in different size for pumping of nichit
Read moreComplete repairing and overhauling of pullen make 120 hp, 550v, 2900rpm submersible motor 6 stage pump at godhur 3 no. under ngk colliery of kusunda area
Complete repairing and overhauling of pullen make 120 hp, 550v, 2900rpm submersible motor 6 stage pump at godhur 3 no. under ngk colliery of kusunda area
Read moreRepairing/fabrication of 02 nos. of base frame of 2000 gpm pump-motor (asp 250g) at s. b. project.
Repairing/fabrication of 02 nos. of base frame of 2000 gpm pump-motor (asp 250g) at s. b. project.
Read moreof your Industry type