Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Installation Testing Commissioning Of 02 Nos Sewage Centrifugal Pumps 50 Hp With Motor Base Frame Coupling Foundation With Nut Bolts At Stp Shirvodem Margao
|
| Description |
Supply Installation Testing Commissioning Of 02 Nos Sewage Centrifugal Pumps 50 Hp With Motor Base Frame Coupling Foundation With Nut Bolts At Stp Shirvodem Margao
|
| Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
| Tender Id | 2024_PWD_15737_1 |
|
Reference Number |
PWDWDXXIF.3012/03/2024-25/261 L3 |
| Tender Fee | 7740 |
| EMD | 47400 |
| Tender Value | - |
| Place | Margao Constituency |
| Link |
View Original Tender Notice
https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=16015 |
| Start Date | June 06, 2024 22:00 |
| End Date |
Expired
14/06/2024
Expired 854 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spare centrifugal thermic fluid pumps complete with suitable electric motor, base frame &accessories
Spare centrifugal thermic fluid pumps complete with suitable electric motor, base frame &accessories
Read moreProvision of sewage treatment plant stp in nausena baugh and nofra at naval base porbandar
Provision of sewage treatment plant stp in nausena baugh and nofra at naval base porbandar
Read morePump centrifugal model: wk125/4 with motor 45 kw, 1450 rpm base frame coupling and starter ksb make.
Pump centrifugal model: wk125/4 with motor 45 kw, 1450 rpm base frame coupling and starter ksb make.
Read moreRepair replacement of perimeter light, secuirty light, pole painting, junction box with mcbs and connected cables with all connected e m items and repair replacement of dg sets, sewage pumps, compressors and machineries at stp at nms under age i
Repair replacement of perimeter light, secuirty light, pole painting, junction box with mcbs and connected cables with all connected e m items and repair replacement of dg sets, sewage pumps, compressors and machineries at stp at nms under age i
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreExtension purlins of rhs 96x48x4mmx0.45mtr,plates for purlins150x100x6mm,ms tee 50x50x6mm 54rm for ceiling panels,ms angle iron 50x50x6mm 51rm,clips for angle and tee,aluminium doors 3x7 feet,aluminium windows,sunshade for doors and s with sheets,wall panels 63mm thick,ceiling panels 40mm thick weight 95.6 sq mtr,flashing for corners 75x75,bird cover 50 kgs,profile colour coated sheet 3.90 mtr x 1050 x 0.63mm,profile colour coated 2.4 mtr 16 nos x 16 256 kgs,ridge cover 300x30xx3000mm long x 0.63mm,foundation bolts 16mm dia x 450mm,hexagonal bolt 12mm x 40mm,hexagonal bolt 16mm dia x 40mm,csk bolt 12mm x 40mm,nuts bolts 12mm x 100mm,ms column of rhs pipe of size 122x3.6mm x 2.8 mtr long,veranda columns of rhs section of size 96x48x4mmx1.9 mtr long,base and top plates of columns 250x250x8mm,top plates for veranda columns 150x150x6m,clips for bottom and top channels,top and bottom channels of size 30x65x30x2mm,clips for channels,truss as per following 8.1 rhs 96x48x4mm 15.75rm,plates for trusses of size 2
Extension purlins of rhs 96x48x4mmx0.45mtr,plates for purlins150x100x6mm,ms tee 50x50x6mm 54rm for ceiling panels,ms angle iron 50x50x6mm 51rm,clips for angle and tee,aluminium doors 3x7 feet,aluminium windows,sunshade for doors and s with sheets,wall panels 63mm thick,ceiling panels 40mm thick weight 95.6 sq mtr,flashing for corners 75x75,bird cover 50 kgs,profile colour coated sheet 3.90 mtr x 1050 x 0.63mm,profile colour coated 2.4 mtr 16 nos x 16 256 kgs,ridge cover 300x30xx3000mm long x 0.63mm,foundation bolts 16mm dia x 450mm,hexagonal bolt 12mm x 40mm,hexagonal bolt 16mm dia x 40mm,csk bolt 12mm x 40mm,nuts bolts 12mm x 100mm,ms column of rhs pipe of size 122x3.6mm x 2.8 mtr long,veranda columns of rhs section of size 96x48x4mmx1.9 mtr long,base and top plates of columns 250x250x8mm,top plates for veranda columns 150x150x6m,clips for bottom and top channels,top and bottom channels of size 30x65x30x2mm,clips for channels,truss as per following 8.1 rhs 96x48x4mm 15.75rm,plates for trusses of size 2
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreMs column of rhs pipe of size 122x3.6mm x 2.8 mtr long,veranda columns of rhs section of size 96x48x4mmx1.9 mtr long,base and top plates of columns 250x250x8mm,top plates for veranda columns 150x150x6m,clips for bottom and top channels,top and bottom channels of size 30x65x30x2mm,clips for channels,truss as per following 8.1 rhs 96x48x4mm 15.75rm,plates for trusses of size 250x250x8mm and joint plates of size 15x50x6mm,purlins of rhs section 96x48x4mmx2.72 mtr,extension purlins of rhs 96x48x4mmx0.45mtr,plates for purlins150x100x6mm,ms tee 50x50x6mm 54rm for ceiling panels,ms angle iron 50x50x6mm 51rm,clips for angle and tee,aluminium doors 3x7 feet,aluminium windows,sunshade for doors and s with sheets,wall panels 63mm thick,ceiling panels 40mm thick weight 95.6 sq mtr,flashing for corners 75x75,bird cover 50 kgs,profile colour coated sheet 3.90 mtr x 1050 x 0.63mm,profile colour coated 2.4 mtr 16 nos x 16 256 kgs,ridge cover 300x30xx3000mm long x 0.63mm,foundation bolts 16mm dia x 450mm,hexagonal bolt
Ms column of rhs pipe of size 122x3.6mm x 2.8 mtr long,veranda columns of rhs section of size 96x48x4mmx1.9 mtr long,base and top plates of columns 250x250x8mm,top plates for veranda columns 150x150x6m,clips for bottom and top channels,top and bottom channels of size 30x65x30x2mm,clips for channels,truss as per following 8.1 rhs 96x48x4mm 15.75rm,plates for trusses of size 250x250x8mm and joint plates of size 15x50x6mm,purlins of rhs section 96x48x4mmx2.72 mtr,extension purlins of rhs 96x48x4mmx0.45mtr,plates for purlins150x100x6mm,ms tee 50x50x6mm 54rm for ceiling panels,ms angle iron 50x50x6mm 51rm,clips for angle and tee,aluminium doors 3x7 feet,aluminium windows,sunshade for doors and s with sheets,wall panels 63mm thick,ceiling panels 40mm thick weight 95.6 sq mtr,flashing for corners 75x75,bird cover 50 kgs,profile colour coated sheet 3.90 mtr x 1050 x 0.63mm,profile colour coated 2.4 mtr 16 nos x 16 256 kgs,ridge cover 300x30xx3000mm long x 0.63mm,foundation bolts 16mm dia x 450mm,hexagonal bolt
Read moreSupply installation testing commissioning of 02 nos sewage centrifugal pumps 25 hp with motor base frame coupling foundation with nut bolts at stp shirvodem margao
Supply installation testing commissioning of 02 nos sewage centrifugal pumps 25 hp with motor base frame coupling foundation with nut bolts at stp shirvodem margao
Read moreUpply, installation testing commissioning of 02 nos 10 hp sewage submersible pumps at stp shirvodem margao.
Upply, installation testing commissioning of 02 nos 10 hp sewage submersible pumps at stp shirvodem margao.
Read moreof your Industry type