Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling, Shifting Of 2000 Gpm Pump Motor And Reformation, Reorganization, Fabrication Of Motor N Pump Foundation Base Frame For Running Of 170 Hp, 550 V Motor N 6 Up4 Pump (1000 Gpm) On The Old Spare Base Frame Including Harmonizing With The Deliv
|
Description |
Dismantling, Shifting Of 2000 Gpm Pump Motor And Reformation, Reorganization, Fabrication Of Motor N Pump Foundation Base Frame For Running Of 170 Hp, 550 V Motor N 6 Up4 Pump (1000 Gpm) On The Old Spare Base Frame Including Harmonizing With The Deliv
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_301321_1 |
Reference Number |
SO(EnM)/e-tender/23-24/33 |
Tender Fee | 0 |
EMD | 2100 |
Tender Value | |
Place | MRSS |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=312131 |
Start Date | February 15, 2024 16:30 |
End Date |
26/02/2024 ( Expired 486 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of pump no. 1 and 3 (river side) including making of flange as per required under kathara washery
Dismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of pump no. 1 and 3 (river side) including making of flange as per required under kathara washery
Read moreFor dismantling, cutting and transporting of structure(iron)of tippler shed, main haulage etc.at mudidih colliery(ii)and making, fabrication and fitting of pontoon with motor pump and base plate fitting size 21x21 ft
For dismantling, cutting and transporting of structure(iron)of tippler shed, main haulage etc.at mudidih colliery(ii)and making, fabrication and fitting of pontoon with motor pump and base plate fitting size 21x21 ft
Read moreFabrication of base plate /frame for 4000gpm/2000gpm pump motor set at sb workshop(ii) fabrication of foot valve 04 nos. bend 8 nos. short piece sluice valve and n.r valve 4 nos. pump body short piece
For fabrication of base plate /frame for 4000gpm/2000gpm pump motor set at sb workshop(ii) fabrication of foot valve 04 nos. bend 8 nos. short piece sluice valve and n.r valve 4 nos. pump body short piece 8 nos.in different size for pumping of nichit
Read morePump shifting, pipeline shifting, change of damage pipe, dismantling and carrying pump-motor from surface to sump and placement on pontoon, and other safety jobs on urgent basis at water body associated with nearby zone at dlb-iii, pandaveswar area
Pump shifting, pipeline shifting, change of damage pipe, dismantling and carrying pump-motor from surface to sump and placement on pontoon, and other safety jobs on urgent basis at water body associated with nearby zone at dlb-iii, pandaveswar area
Read moreFabrication of 02(two) nos additional base frame, motor pump installation on fabricated base frame along with supplying and fixing all required accessories at tapin open cast project hazaribagh area.
Fabrication of 02(two) nos additional base frame, motor pump installation on fabricated base frame along with supplying and fixing all required accessories at tapin open cast project hazaribagh area.
Read moreFabrication and erection of steel base frame with pcc foundation for 28 lps pump motor at filter plant of township, rajrappa area
Fabrication and erection of steel base frame with pcc foundation for 28 lps pump motor at filter plant of township, rajrappa area
Read moreDismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Dismantling, laying and di of 3 range x 390m of 8 and 10 inch dia. pipeline with all electrical accessories for multiple shifting of pump-motor for a period of 12 months running for dewatering at quarry no. 03 under ktc.
Read moreDismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump and motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 (monsoon activity no. 04 ) in kakri
Dismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump and motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 (monsoon activity no. 04 ) in kakri
Read moreA)dismantling with re-installation of pump and motor with bed plate on the pontoon with fixing after line leveling and di of pipe linedocp.(b) dismantling with shifting and re-installation of pump with motor sets transformer, h.t. switch
A)dismantling with re-installation of pump and motor with bed plate on the pontoon with fixing after line leveling and di of pipe linedocp.(b) dismantling with shifting and re-installation of pump with motor sets transformer, h.t. switch
Read moreDismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 in kakri project
Dismantling and repairing of 03 nos. old pontoon and fabrication of 03 nos. new pontoon with commissioning of pump motor including shading, drum pontoon and fabrication of drum pontoons during monsoon 2025-26 in kakri project
Read moreof your Industry type