Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
All In One Pc
|
| Description |
|
| Organisation | Revenue and Forest Department Maharashtra | undefined |
| Tender Id | GEM/2023/B/3857414 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | August 22, 2023 19:21 |
| End Date |
Expired
01/09/2023
Expired 1085 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
YAKSHINI MICRO SYSTEMS
1927530
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | Status |
|---|---|---|---|---|---|
| 1 | ARIHANT ENTERPRISE | Make : CYNIX Model : CYNIX GenX iX2300 All in one Desktop | 01-09-2023 13:52:55 | Vendor Assessed | Disqualified |
| 2 | DHARAM AGENCIES | Make : Dell Model : Dell OptiPlex 5400 AIO | 31-08-2023 21:18:13 | Vendor Assessed | Disqualified |
| 3 | KJM GROUP SYSTEM SOLUTIONS | Make : hp Model : HP 440 G9 AIO i5 12500T Win11P 813 ODD wifi 23.8" | 01-09-2023 11:17:40 | Registered with designated Agency / Authority | Qualified |
| 4 | ODISSI SYSTEMS AND SOLUTIONS | Make : Dell Model : Dell OptiPlex 7410 AIO | 31-08-2023 15:42:00 | Registered with designated Agency / Authority | Qualified |
| 5 | PIXCEL SQUARE TECHNOLOGIES LLP | Make : VOLTRIQ Model : AI500 | 01-09-2023 13:19:18 | Registered with designated Agency / Authority | Disqualified |
| 6 | SUMU COM SYSTEMS | Make : hp Model : HP 440 G9 AIO i5 12500 Win11P 815125 wifi 23.8" | 30-08-2023 14:24:16 | Registered with designated Agency / Authority | Disqualified |
| 7 | YAKSHINI MICRO SYSTEMS | Make : hp Model : HP 440 G9 AIO i5 12500T Win11H 85123 wifi 23.8" | 01-09-2023 13:16:00 | Registered with designated Agency / Authority | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | YAKSHINI MICRO SYSTEMS | Item Categories : All in One PC | 1927530.00 | L1 |
| 2 | KJM GROUP SYSTEM SOLUTIONS | Item Categories : All in One PC | 2277990.00 | L2 |
| 3 | ODISSI SYSTEMS AND SOLUTIONS | Item Categories : All in One PC | 2838000.00 | L3 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| hp Intel Core i5 All in One PC with 23.8 Inch Display/ Windows 11 Home | hp | HP 440 G9 AIO i5 12500T Win11H 85123 wifi 23.8" | 33 | ₹ 1927530.000 |
Const. of , new rcc drain dhobi ghat , and desilting, and cleaning of all rain drains in fazilka city
Const. of , new rcc drain dhobi ghat , and desilting, and cleaning of all rain drains in fazilka city
Read moreSupplying all materials at site including pipes, specials, labors, tools and tackles etc. for laying and jointing of ms pipe for conveying main as per latest is specification. lowering of ms pipes and specials in trenches up to a depth of 3 m below gl. laying and jointing the same inside the trench/ over the ground by means of electric arch welding (spirally welded) using standard electrodes as per latest is specification including earth work in excavation in all kind of soil so as to give one m
Supplying all materials at site including pipes, specials, labors, tools and tackles etc. for laying and jointing of ms pipe for conveying main as per latest is specification. lowering of ms pipes and specials in trenches up to a depth of 3 m below gl. laying and jointing the same inside the trench/ over the ground by means of electric arch welding (spirally welded) using standard electrodes as per latest is specification including earth work in excavation in all kind of soil so as to give one meter average cover over the pipe with disposal of excavated earth within initial lead and lift with disinfection of pipes, testing of pipes against 60 m water head etc. to protect against corrosion pipes are given epoxy lining or hot applied coal tar/ asphalt lining or rich cement mortar lining at works or in the field by the centrifugal process. the outer coating for pipe may be in cement sand guniting or hot applied coal- tar asphaltic enamel reinforced with fibre glass fabric yarn as per cpheeo manual of water supply and treatment all complete job as per standard specification. 600 mm dia (minimum thickness- 6.40 mm)
Read moreRepair renovation painting white washing providing and fixing repair of sanitary works complete in all respect at hsvp staff qtr. no. 5 b f.f in vill. abheypur in ia ph i panchkula
Repair renovation painting white washing providing and fixing repair of sanitary works complete in all respect at hsvp staff qtr. no. 5 b f.f in vill. abheypur in ia ph i panchkula
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreConstruction of one no. panchayat sarkar bhawan at each panchayat (bhalura simtoka panchayat and rampur shanbhuta panchayat) at aurai block in muzaffarpur district for the year - 2025-26 (electrification included).
Construction of one no. panchayat sarkar bhawan at each panchayat (bhalura simtoka panchayat and rampur shanbhuta panchayat) at aurai block in muzaffarpur district for the year - 2025-26 (electrification included).
Read moreConstruction of one no. panchayat sarkar bhawan at each panchayat (changel panchayat, khanguradih panchayat and nagawara panchayat) at katra block in muzaffarpur district for the year - 2025-26 (electrification included)
Construction of one no. panchayat sarkar bhawan at each panchayat (changel panchayat, khanguradih panchayat and nagawara panchayat) at katra block in muzaffarpur district for the year - 2025-26 (electrification included)
Read moreEngagement of consultancy services for preparation of detailed project report (dpr) for implementation of model solar village scheme in all the districts of bihar under pradhan mantri-surya ghar: muft bijli yojna.
Engagement of consultancy services for preparation of detailed project report (dpr) for implementation of model solar village scheme in all the districts of bihar under pradhan mantri-surya ghar: muft bijli yojna.
Read moreDrain repair, slab casting for existing drain & chamber, filling of brick bats, local sand, gsb etc. in water logged/low land area, repairing and patch work of existing road & pavement and other miscellaneous work in all wards of nagar panchayat, punpun, patna
Drain repair, slab casting for existing drain & chamber, filling of brick bats, local sand, gsb etc. in water logged/low land area, repairing and patch work of existing road & pavement and other miscellaneous work in all wards of nagar panchayat, punpun, patna
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreof your Industry type