Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Work Of Feasibility Survey
|
| Description |
For 4 Laning Of Roshanabad Kurkawala Biharigarh State Road 27 (Length 32.300km) (Pd Haridwar) And Bahadarabad Dhanauri Imlikheda Bhagwanpur Gagalhedi Road State Road 68 (Length 29.15km)(Cd Roorkee) Through Ppp Mode
|
| Organisation | Government of Uttarkhand |
| Tender Id | 2024_pwd_67255_1 |
|
Reference Number |
03/06C dated 01.01.2024 |
| Tender Fee | 3540 |
| EMD | 0 |
| Tender Value | - |
| Place | Office of SE Civil Circle PWD Haridwar |
| Link |
View Original Tender Notice
https://uktenders.gov.in |
| Start Date | January 10, 2024 20:30 |
| End Date |
Expired
23/01/2024
Expired 974 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreSurvey, investigation, design, supply, erection, testing and commissioning of lis for supplementing water to suffering atchkat of 3997ha of d 76 of tlbc by lifting water from tungabhadra river near yedival village of manvi taluk, raichur district on turnkey basis, phase i
Work comprising of construction of intake structure, jack well cum pumphouse, pumping machineries (2 pumps), 33/6.6kv electrical substation with power transformer, 33kv transmission line, 110/33kv transformer bay with 33kv terminal bay, rising main including supply of spare parts and tools, o and m for five years after successful commissioning of the entire scheme on turnkey basis
Read moreConstruction of conference hall at vikarabad of vikarabad district(balance work)
Construction of conference hall at vikarabad of vikarabad district(balance work)
Read moreRepair and painting work of exterior walls and internal corridors of all hostel buildings at aiims patna
Repair and painting work of exterior walls and internal corridors of all hostel buildings at aiims patna
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreBalance work to arch gate sri kaleshwara muktheshwara swamy vari devasthanam, kaleshwaram (v), mahadevpur (m), jayashankar bhupalpally district
Balance work to arch gate sri kaleshwara muktheshwara swamy vari devasthanam, kaleshwaram (v), mahadevpur (m), jayashankar bhupalpally district
Read moreConstruction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Construction of balance work of additional class rooms at ashram high school (girls) at dodarna (v) kubeer (m) in nirmal district
Read moreBt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Bt on r/f velthurlapally x road to gurrampet via, kondapur in ghanpur(mulugu)(m) of jayashankar bhupalpally district. (balance work part -b) estimate cost rs.3500.00 lakhs (grant:crr) (3rd call)
Read moreUpgrdation of existing sas system schneider electric make pascis oi to latest sofware with replacemement of associated hardware i.e., cpu cards di and do cards in schneider electric make bcu and work stations (as per boq) at 220/132/33 kv kosigi ss in mahabubnagar circle.
Upgrdation of existing sas system schneider electric make pascis oi to latest sofware with replacemement of associated hardware i.e., cpu cards di and do cards in schneider electric make bcu and work stations (as per boq) at 220/132/33 kv kosigi ss in mahabubnagar circle.
Read moreof your Industry type