Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 2nos. Of Retaining Wall In Rviia (Bonbahal) Seam For Intermediate Stage Pumping At Shyamsundarpur Colliery(retender)
|
Description |
Construction Of 2nos. Of Retaining Wall In Rviia (Bonbahal) Seam For Intermediate Stage Pumping At Shyamsundarpur Colliery(retender)
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_299601_1 |
Reference Number |
ECL/GM/BA/E TENDER/23-24/Min/276 Dt 24.01.2024 |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | Shyamsundarpur Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=310356 |
Start Date | January 25, 2024 23:30 |
End Date |
05/02/2024 ( Expired 497 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreConstr of bow string steel arch major bridge
Rfp for construction of bow string steel arch major bridge (2nos) across river iravanjippuzha in the
 kozhikode district of kerala state anakkampoyil kalladi meppadi package i
Read moreEngaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Engaging an independent engineer (ie) during operation and maintenance stage and supervision of black spots construction for hyderabad - bangalore section nh-44 contract packages ap-03, ap-04, ap-05 in the state of telangana.
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Read moreConstruction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of buttress wall below the 1065 mb level buttress wall of dep- 14 (20 meter in length) at dep 14 biom kirandul complex
Construction of buttress wall below the 1065 mb level buttress wall of dep- 14 (20 meter in length) at dep 14 biom kirandul complex
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreof your Industry type