Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing,Laying,Comp Of Readymade Bm 50 Mm Thick Layer (Comp),Bc 30 Mm Thick Layer (Comp),Rd Mrkng With Tp Paint 2.5 Mm Thick And Fixing Of Cateye For Resurf W Ks On Rd Galhar Sansari Bet Km 10.00 To 25.00(12.489 Km Cl 9 Eqvt) Under 118 Rcc/35 Tf/Spk
|
| Description |
Providing,Laying,Comp Of Readymade Bm 50 Mm Thick Layer (Comp),Bc 30 Mm Thick Layer (Comp),Rd Mrkng With Tp Paint 2.5 Mm Thick And Fixing Of Cateye For Resurf W Ks On Rd Galhar Sansari Bet Km 10.00 To 25.00(12.489 Km Cl 9 Eqvt) Under 118 Rcc/35 Tf/Spk
|
| Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
| Tender Id | 2025_BRO_692231_1 |
|
Reference Number |
CE (P) SPK/16/2024-25 |
| Tender Fee | 0 |
| EMD | 2.78 Lakh |
| Tender Value | - |
| Place | BETWEEN KM 10.00 TO KM 25.00 (TOTAL-12.489 KM CL-9 |
| Link |
View Original Tender Notice
https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=774971 |
| Start Date | January 13, 2025 15:30 |
| End Date |
Expired
27/01/2025
Expired 624 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Surfacing work (wmm, dbm, bc, tc, pc, rm) as per boq/ps btwn km 62.00 to km 67.00 re-alignment stretches take off pt km 62.00 (km 0.00) and meeting pt km 67.00 (km 5.00) and btwn km 54.00 to km 55.00 on galhar-sansari road in 118 rcc/project spk
Surfacing work (wmm, dbm, bc, tc, pc, rm) as per boq/ps btwn km 62.00 to km 67.00 re-alignment stretches take off pt km 62.00 (km 0.00) and meeting pt km 67.00 (km 5.00) and btwn km 54.00 to km 55.00 on galhar-sansari road in 118 rcc/project spk
Read moreBm 50 mm thick, bc 30 mm thick, rd marking with tp paint 2.5 mm thick and fixing of cat eyes for resurf wks bet km 0.00 to 3.00 on kistwar dul road and bet km 52.75 to 54.00 on galhar-sansari rd in 118 rcc under 35 tf (p) spk in jk
Bm 50 mm thick, bc 30 mm thick, rd marking with tp paint 2.5 mm thick and fixing of cat eyes for resurf wks bet km 0.00 to 3.00 on kistwar dul road and bet km 52.75 to 54.00 on galhar-sansari rd in 118 rcc under 35 tf (p) spk in jk
Read moreProviding, laying and compaction of hmp mix for bm 50 mm thick layer, bc 30 mm thick layer, road marking 2.5 mm thick and fixing of cat eyes b/w km 0.00 to 6.50 on dul- galhar road in 118 rcc/35 brtf/ project sampark in jk (ut)
Providing, laying and compaction of hmp mix for bm 50 mm thick layer, bc 30 mm thick layer, road marking 2.5 mm thick and fixing of cat eyes b/w km 0.00 to 6.50 on dul- galhar road in 118 rcc/35 brtf/ project sampark in jk (ut)
Read moreProv,lay,spread nd comp of rdymde bitumin(hmp) mix for bm 50 mm tk layer,bc 30 mm tk layer,aw rd mrking wt tp paint 2.5 mm tk for resurf wks bet km 69.940-72.000 on dhar-udhampur rd (net length 2.060 km and 3.671 km eqvt cl-9) in 69 rcc 35 tf p spk
Prov,lay,spread nd comp of rdymde bitumin(hmp) mix for bm 50 mm tk layer,bc 30 mm tk layer,aw rd mrking wt tp paint 2.5 mm tk for resurf wks bet km 69.940-72.000 on dhar-udhampur rd (net length 2.060 km and 3.671 km eqvt cl-9) in 69 rcc 35 tf p spk
Read moreDesign and construction of 50mtr span major pmt br steel girder through type with rcc decking on open foundation over kaban nallah at km 44.400 on rd galhar-sansari 118 rcc 35 brtf pjt sampark in jk
Design and construction of 50mtr span major pmt br steel girder through type with rcc decking on open foundation over kaban nallah at km 44.400 on rd galhar-sansari 118 rcc 35 brtf pjt sampark in jk
Read moreProviding,laying,spreading n comp of 30 mm bc incl tack coat n corr work with 50 mm thick bm incl tack coat b/w km 86.725 to km 114.875 on budhal-mahore-gul rd 110 rcc/31 brtf/spk in jk (ut)
Providing,laying,spreading n comp of 30 mm bc incl tack coat n corr work with 50 mm thick bm incl tack coat b/w km 86.725 to km 114.875 on budhal-mahore-gul rd 110 rcc/31 brtf/spk in jk (ut)
Read moreProviding,laying,spreading and compaction of 40 mm bc and 50 mm bm incl tack coat with rd marking with thermoplastic paint for resurf wk on rd jammu-srinagar bet km 4.490 to km 9.310 net 4.820 km and 8.588 km eqvt cl-9 under 69 rcc/35tf (p) spk in jk
Providing,laying,spreading and compaction of 40 mm bc and 50 mm bm incl tack coat with rd marking with thermoplastic paint for resurf wk on rd jammu-srinagar bet km 4.490 to km 9.310 net 4.820 km and 8.588 km eqvt cl-9 under 69 rcc/35tf (p) spk in jk
Read moreProviding, laying, spreading and compaction of 30 mm thick bc including tack coat and correction work 50 mm bm including tack coat with road marking with thermoplastic b/w km 44.60 to 46.93 and 48.025 to 52.750 on galhar sansari road under 118 rcc
Providing, laying, spreading and compaction of 30 mm thick bc including tack coat and correction work 50 mm bm including tack coat with road marking with thermoplastic b/w km 44.60 to 46.93 and 48.025 to 52.750 on galhar sansari road under 118 rcc
Read moreExec of protect wks for slope protect at approach of nagrah br at km 0.980 and at approach of naigarh br at km 11.050 on dul-galhar rd incl geological investigat, preparat of design and its proof check from iit under 118 rcc /35tf of p sampark in jk
Exec of protect wks for slope protect at approach of nagrah br at km 0.980 and at approach of naigarh br at km 11.050 on dul-galhar rd incl geological investigat, preparat of design and its proof check from iit under 118 rcc /35tf of p sampark in jk
Read moreDesign and construction of 80 m single span maj pmt bridge including proof checking from iit with steel superstructure (through type) and rcc decking on open fdn over singarh nallah at km 4.089 on galhar-sansari rd 118 rcc/35 brtf of project sampark
Design and construction of 80 m single span maj pmt bridge including proof checking from iit with steel superstructure (through type) and rcc decking on open fdn over singarh nallah at km 4.089 on galhar-sansari rd 118 rcc/35 brtf of project sampark