Tender Details
About Tender
🛣️ Invitation For Bids: Road Infrastructure Project 🛣️ The Road Construction Department (Rcd Ein C), Under The State Government And Union Territories, Is Seeking Bids For The Widening And Strengthening/Reconstruction Of A Key Road Stretch In Dumka. 🗺️ 📍 Project Scope: Budhikurwa (On Nh 114 A) Dighhi More (Bhaluwa More) (On Nh 133) Via Kamardiha Dumaria Aamghata Matihari Road, Spanning A Total Length Of 14.685 Km. 📅 Bid Submission Deadline: July 11, 2024, 12:00 Pm 💲 Tender Fee: Inr 10,000 💲 Earnest Money Deposit (Emd): Inr 4,39,000 Interested Bidders Must Possess The Requisite Expertise And Resources To Undertake This Extensive Road Infrastructure Project. Detailed Bids, Including Technical And Financial Proposals, Are To Be Submitted As Per The Tender Documents. Keywords: Road Infrastructure, Widening And Strengthening, Reconstruction, Rcd Ein C, State Govt. And Ut, Tender, Bid, Dumka, Nh 114 A, Nh 133Particulars | Details |
---|---|
Title |
Widening And Strengthening/Reconstruction Of Budhikurwa (On Nh 114 A) Dighhi More (Bhaluwa More) (On Nh 133) Via Kamardiha Dumaria Aamghata Matihari Road (Total Length 14.685 Km) Under Road Division Dumka For The Year 2024 25
|
Description |
Widening And Strengthening/Reconstruction Of Budhikurwa (On Nh 114 A) Dighhi More (Bhaluwa More) (On Nh 133) Via Kamardiha Dumaria Aamghata Matihari Road (Total Length 14.685 Km) Under Road Division Dumka For The Year 2024 25
|
Organisation | RCD EinC | State Govt. and UT |
Tender Id | 2024_CECOM_86943_1 |
Reference Number |
RCD/DUMKA/863 |
Tender Fee | 10000 |
EMD | 43.9 Lakh |
Tender Value | |
Place | DUMKA |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=116945 |
Start Date | June 26, 2024 16:00 |
End Date |
11/07/2024 ( Expired 312 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreRepair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreStrengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreGopiballavpur nayagram road from 35.00 km to 41.60km
Gopiballavpur nayagram road from 35.00 km to 41.60km, strengthening work including reconstruction of 2 nos. cd structures and 215.00 m protective work under jhargram highway division in the district of jhargram.
Read moreMtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Read moreof your Industry type