Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ted 413/Sub Urban Gurugram/...
|
Description |
Development Of Distribution Infrastructure At Sub Urban Gurugram Division (Under Gurugram Ii Circle) Of Haryana Under The Revamped Reforms Based And Results Linked, Distribution Sector Scheme (Loss Reduction Works)
|
Organisation | Government of Haryana |
Tender Id | 2023_HBC_288746_1 |
Reference Number |
2023CA0CEF1C F264 48A5 ACF1 34483EEE922C1033DHB |
Tender Fee | 5900 |
EMD | 73 Lakh |
Tender Value | |
Place | XEN/PandD-II |
Link | https://etenders.hry.nic.in |
Start Date | June 09, 2023 16:30 |
End Date |
12/09/2023 ( Expired 654 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of medical sub centre at tegazong nhm
Construction of medical sub centre at tegazong nhm
Read moreProcurement of 07 number 500mva power transformers on turnkey basis.
Design supply erection testing commissioning of 07 no of 400 220 33kv 500 mva power transformer at 400 kv sub stations of dtl on turnkey basis
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of road and drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase
Construction of road and drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase
Read moreConstruction of rcc drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase
Construction of rcc drain at different ward under the chief minister s urban infrastructure development scheme 4 th phase
Read morePlantation of tree
Work for plantation of poplar trees on vacant land situated at 220 kv sub station jagadhri
Read moreSurface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of various 220/132 lines under tlm sub dn. itarsi under administrative control of ee (eht-maint.) dn. itarsi
Surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of various 220/132 lines under tlm sub dn. itarsi under administrative control of ee (eht-maint.) dn. itarsi
Read moreGeotechnical sub soil investigation and topographical survey by total station machine in the district of paschim medinipur and jhargram during the year 2025-2026 (2nd call).
Geotechnical sub soil investigation and topographical survey by total station machine in the district of paschim medinipur and jhargram during the year 2025-2026.
Read moreof your Industry type