Tender Details

Particulars Details
Title
Construction Of Retaining Wall From New Bridge (Jama Masjid) To Jam River, Ward No. 06 In Nagar Panchyat Limit At Kondhali
Description
Construction Of Retaining&Amp#X0d Wall From New Bridge&Amp#X0d (Jama Masjid) To Jam River,&Amp#X0d Ward No. 06 In Nagar&Amp#X0d Panchyat Limit At Kondhali
Organisation Directorate Of Municipal Administration | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1680
EMD 1.75 Lakh
Tender Value
Place Kondhali
Link

AAAAAAAAAA

Login to view
Start Date June 20, 2025 17:30
End Date

27/06/2025 ( 6 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m

Read more
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal

Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal

Read more
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di

Read more
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise