Tender Details

Particulars Details
Title
Site Clearance,Excavation,Sub Base Preparation,Pcc Base Preparation,Fibre Mesh,Pole With Ball,Layer
Description
Organisation Department of Military Affairs | Ministry of Defence
Tender Id GEM/2024/B/5667489
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date January 01, 2025 23:24
End Date
Expired 22/01/2025

Expired 634 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 5 Lakhs Experience with Gov. Required: Years
Ministry: Ministry Of Defence
Department: Department Of Military Affairs
Organisation: Indian Army
Similar Tenders
(1). dual layer semi absorbable polypropylene polyglycolic acid fibre mesh 6 in x 81 /1 x 1/ (2). dual layer semi absorbable polypropylene polyglycolic acid fibre mesh 6 in (1 x 1 )

(1). dual layer semi absorbable polypropylene polyglycolic acid fibre mesh 6 in x 81 /1 x 1/ (2). dual layer semi absorbable polypropylene polyglycolic acid fibre mesh 6 in (1 x 1 )

Read more
Site preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing

Site preparation and cleaning,earthwork and sub base repair,repair of water bound macadam layer,repair of asphalt or hot mix base,crack filling and surface leveling,repair of resurfacing of synthetic basketball court,synthetic surface coating system,basketball court line marking,repair of basketball backboards,repair of basketball hoops and nets,repair of basketball pole and supporting structure,drainage repair,water remover roller repair,repair of periphery or surrounding area,repair of surface colour and finish,final cleaning and finishing

Read more
Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing

Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing

Read more
Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work

Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Carbon fibre frame,motors,propeller set 9 4 per drone,esp now sub system,lora mesh sub system,rf cables,encrypted hd vtx,ground video receiver,esc incl spares,6s 10000mah li po battery,smart charger,accy like tool kit comma 3 d printed mounts comma waterproof connectors comma landing gear comma rf antennas,flight controller for master drone pixhawk 6x,septentrio mosiac x5 dev kit for master drone,nvidia jetson orin nano 8 gb ai computer,flight controller for slaave drones matek h743 wing,sony imx335 cmos comma 5mp,uncooled lwir termal camera comma 640 by 512 resolution,u club m10n gnss module,esp32 base stn for master drone,lora gateway,radio master tx 16s mark 2,8 tb nas hdd,synology ds423 plus 4 bay nas,42 inch monitor,ups,software integ,ai enabled gcs laptop with amd ryzen ai 9 processor comma 64 gb ddr5 ram comma 1 tb nvme ssd and nvidia rtx 4070 class gpu

Carbon fibre frame,motors,propeller set 9 4 per drone,esp now sub system,lora mesh sub system,rf cables,encrypted hd vtx,ground video receiver,esc incl spares,6s 10000mah li po battery,smart charger,accy like tool kit comma 3 d printed mounts comma waterproof connectors comma landing gear comma rf antennas,flight controller for master drone pixhawk 6x,septentrio mosiac x5 dev kit for master drone,nvidia jetson orin nano 8 gb ai computer,flight controller for slaave drones matek h743 wing,sony imx335 cmos comma 5mp,uncooled lwir termal camera comma 640 by 512 resolution,u club m10n gnss module,esp32 base stn for master drone,lora gateway,radio master tx 16s mark 2,8 tb nas hdd,synology ds423 plus 4 bay nas,42 inch monitor,ups,software integ,ai enabled gcs laptop with amd ryzen ai 9 processor comma 64 gb ddr5 ram comma 1 tb nvme ssd and nvidia rtx 4070 class gpu

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise