Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pyrometer Flue Gas Temp Measurement Mahan Unit 1,Pyrometer Flue Gas Temp Measurement Mahan Unit 2,P
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2025/B/6447095 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 13, 2025 00:13 |
| End Date |
Expired
23/07/2025
Expired 445 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Dual channel analyzer and spares for ph/conductivity measurement of swas system
Dual channel analyzer and spares for ph/conductivity measurement of swas system
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreCarrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Carrying out breakdown maintenance of gates and dampers in unit 3 boiler flue gas and air path as and when required from the actual date of commencement of work to 31.03.2027 for the fy 2026-27
Read moreOut sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Out sourcing of nd testing, hydraulic pressure testing, calibration of pressure gauge and relief valve and shell thickness measurement of air reciever tanks of hemm working at kkocp for period of 3 years.
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreSupply, installation and commissioning of phasor measurement units(pmus) at lv side for generating transformers(gts),400kv lines and bus bars of the generating units as per cea regulations at yadadri thermal power station (5x800mw), veerlapalem(v),damercherla(m),nalgonda dist 508208
Supply, installation and commissioning of phasor measurement units(pmus) at lv side for generating transformers(gts),400kv lines and bus bars of the generating units as per cea regulations at yadadri thermal power station (5x800mw), veerlapalem(v),damercherla(m),nalgonda dist 508208
Read morePyrometer for rail temperature measurement.
For complete deion and other details, please refer to tender
Read moreof your Industry type