Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Civil Repair And Maintenance Works To A Block At Kolar. Sub Works.
|
Description |
Civil Repair And Maintenance Works To A Block At Kolar. Sub Works Repairs To Open Surface Drain, Connection From Waste Water From Kitchen And Bath To Man Holes, Pavers For Path Way From Cycle Shed To Gate And Gate To D Block
|
Organisation | Department of Posts | Central Govt. Ministry/Department |
Tender Id | 2024_DOP_827612_1 |
Reference Number |
NIT No.14/PCD/BGL/2024-25 |
Tender Fee | 0 |
EMD | 17409 |
Tender Value | |
Place | Kolar |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=869682 |
Start Date | September 24, 2024 22:30 |
End Date |
01/10/2024 ( Expired 257 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
One time repair of 04 nos. of high pressure jet cleaning machines make karcher at rcnk snp
For complete deion and other details, please refer to tender
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDoor to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreAppointment of issuing bank for a letter of credit
Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreof your Industry type