Tender Details
Particulars | Details |
---|---|
Title |
Snow Clearance Of Panzoo To Shojan Package No Jk10140 Length 7.5km,Block Tral, District Pulwama.
|
Description |
Snow Clearance Of Panzoo To Shojan Package No Jk10140 Length 7.5km,Block Tral, District Pulwama.
|
Organisation | National Rural Road Development Agency (NRRDA) |
Tender Id | 2023_KSRRD_129107_4 |
Reference Number |
E-NIT No 08/EE/PMGSY/PUL OF 2023-24 dated 04/11/20 |
Tender Fee | 500 |
EMD | 5000 |
Tender Value | |
Place | Office of the Executive Engineer PMGSY Div. Pulwam |
Link | https://pmgsytenders.gov.in |
Start Date | November 06, 2023 16:00 |
End Date |
11/11/2023 ( Expired 550 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreAugmentation of water supply scheme bhunder from tubewell to canal based block rampura district bathinda under nabard xxx project
Augmentation of water supply scheme bhunder from tubewell to canal based block rampura district bathinda under nabard xxx project
Read moreUrgent repair of room no. 7,9,10,11,12,13,14 and partial main block roof treatment of dum dum girls high school (h.s) in the district of north 24 pgs.
Urgent repair of room no. 7,9,10,11,12,13,14 and partial main block roof treatment of dum dum girls high school (h.s) in the district of north 24 pgs.
Read moreChambal alwar bharatpur water supply project package-iii based on hybrid annuity model (ham) ace(p) bharatpur nit no. 06/2024-25
Work of construction of cwr and block cwph at various locations for clusters laying of transfer main from block ps to block cps rising main from block cps to block esrs, construction of esrs laying of cluster distribution mains cabp pck 3 under jjm
Read moreNie-t-31/2025-26 (sl. no. 02)
Construction of cc road from baliadanga namopara dilip house to sultana b.ed college at kaliachak ii gp under kaliachak-i block in the district of malda. (length-1375.00, width 3.75m)
Read moreConstruction of patalganga-ganai-molta motor raod from chainage 0.250 to 3.000. in block jyotirmath of district chamoli (hill side cutting, scupper, drain, muck disposal)
Construction of patalganga-ganai-molta motor raod from chainage 0.250 to 3.000. in block jyotirmath of district chamoli (hill side cutting, scupper, drain, muck disposal)
Read moreUpgradation to cemoc centre of gosaba rh under gosaba block, south 24 parganas - sitc of 1 no. 82.5 kva dg set.
Upgradation to cemoc centre of gosaba rh under gosaba block, south 24 parganas - sitc of 1 no. 82.5 kva dg set.
Read moreShort term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma
Short term maintenance contract (stmc) for maintenance of nh 753 in amdi to saoner section in km 226/140 to 226/280 km 231/600 to 232/540 km 256/245 to 256/800 and km 264/800 to 265/724. (total length 2.560 km) in nagpur district in the state of ma
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreof your Industry type