Results for: strap

1,568 tenders

Find the latest strap tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for strap e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.

Clamp with strap assy. ilg-2650. /ifl-8540

Clamp with strap assy. ilg-2650. /ifl-8540

Organisation: Advanced Weapons and Equipment India Limited | Department of Defence Production
Start Date: October 12, 2026 22:38
Read more
Due Date: 4 days left

Lv1 r72 175.61.040a fork,lv1 r72 175.04.245.2 angle piece left hand,lv1 r90 184.04.023sb 3rd rh strap,lv1 r90 184.04.022sb 4th rh strap,lv1 r90 172.23.028sb neck,lv1 r90 184.04.015-1 strap,lv1 r90 172.23.029sb neck,lv1 r90 172.23.100 axle,lv1 r90 176.93.057 strap,z7 r90 188.21.014sb flange

Lv1 r72 175.61.040a fork,lv1 r72 175.04.245.2 angle piece left hand,lv1 r90 184.04.023sb 3rd rh strap,lv1 r90 184.04.022sb 4th rh strap,lv1 r90 172.23.028sb neck,lv1 r90 184.04.015-1 strap,lv1 r90 172.23.029sb neck,lv1 r90 172.23.100 axle,lv1 r90 176.93.057 strap,z7 r90 188.21.014sb flange

Organisation: Indian Army | Department of Military Affairs
Start Date: October 12, 2026 15:15
Read more
Due Date: 15 days left

Set of safety strap for lhb type bio tank consisting of two items:-(1) safety strap as per drg.no.- aaa63669, qty-01 no. per set. (2) safety strap as per drg.no.- aaa63668 qty-01 no. per set.

Set of safety strap for lhb type bio tank consisting of two items:-(1) safety strap as per drg.no.- aaa63669, qty-01 no. per set. (2) safety strap as per drg.no.- aaa63668 qty-01 no. per set.

Organisation: Ministry of Railways
Start Date: October 05, 2026 17:32
Read more
Due Date: 11 days left

Modified safety strap for equalising stay (for 13t. axle load bogie) etc.

Modified safety strap for equalising stay (for 13t. axle load bogie) etc.

Organisation: Ministry of Railways
Start Date: September 24, 2026 22:02
Read more
Due Date: 44 days left

26b61l015 (n6145-p062177) bond strap len 300 mm 35 sq mm dia both end steel lug,26b61l015 (n6145-p062178) bond strap len 300 mm 35 sq mm dia one end steel & alu,26b61l015 (n6145-p062179) bond strap len 300 mm 35 sq mm dia both end alu

26b61l015 (n6145-p062177) bond strap len 300 mm 35 sq mm dia both end steel lug,26b61l015 (n6145-p062178) bond strap len 300 mm 35 sq mm dia one end steel & alu,26b61l015 (n6145-p062179) bond strap len 300 mm 35 sq mm dia both end alu

Organisation: Indian Navy | Department of Military Affairs
Start Date: October 06, 2026 21:30
Read more
Due Date: 9 days left

S trap arrangement of 100 mm, set of bio-toilet safety bracket, safety strap & u bracket

S trap arrangement of 100 mm, set of bio-toilet safety bracket, safety strap & u bracket

Organisation: Ministry of Railways
Start Date: September 22, 2026 23:11
Read more
Due Date: 2 days left

Digital video camera full frame format,digital video camera aps format,action camera with helmet mount strap

Digital video camera full frame format,digital video camera aps format,action camera with helmet mount strap

Organisation: Indian Air Force | Department of Military Affairs
Start Date: October 07, 2026 18:40
Read more
Due Date: 10 days left

Clamp-saddle strap to blw part no. 16141 [clamp-saddle strap to blw part no. 16141556/ emd part no. 8347343 and blw drg.no. 8347343 alt-ja. material spec: sae 1045 stl or 1541 steel, cold drawn or cold forged. ]

Clamp-saddle strap to blw part no. 16141 [clamp-saddle strap to blw part no. 16141556/ emd part no. 8347343 and blw drg.no. 8347343 alt-ja. material spec: sae 1045 stl or 1541 steel, cold drawn or cold forged. ]

Organisation: Ministry of Railways
Start Date: September 28, 2026 17:56
Read more
Due Date: 2 days left

Supply and demostration of fall arrestor-? full body adjustable work positioning sit harness with padded leg strap & shoulder strap for the maintenance of three phase electric locomotive as per indenter s specification no.-sgud/ph42-3/me-10/26 , dt.28.09.2026

Supply and demostration of fall arrestor-? full body adjustable work positioning sit harness with padded leg strap & shoulder strap for the maintenance of three phase electric locomotive as per indenter s specification no.-sgud/ph42-3/me-10/26 , dt.28.09.2026

Organisation: Ministry of Railways
Start Date: October 16, 2026 01:26
Read more
Due Date: 4 days left

Safety strap for axle box guide arrangement to icf drg no:t-0-1-631, alt:i/4 (small l 4).

Safety strap for axle box guide arrangement to icf drg no:t-0-1-631, alt:i/4 (small l 4).

Organisation: Ministry of Railways
Start Date: October 08, 2026 19:58
Read more
Due Date: 11 days left

Need support responding to this opportunity?

Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.

Get Opportunity Matching Support
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise