Results for: Stacker Reclaimer
Find the latest Stacker Reclaimer tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Stacker Reclaimer e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.
Ichp -clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north, south sides of stacker-i and reclaimer-i machines travel path in conveyor-49.
Ichp -clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north, south sides of stacker-i and reclaimer-i machines travel path in conveyor-49.
Ichp -clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north , south sides of stacker-i and reclaimer-i machines travel path in conveyor-49
Ichp -clearing the slided and spilled coal along the walkways over&#x0d below deck sheets, between the track rails and outside the track rails both north , south sides&#x0d of stacker-i and reclaimer-i machines travel path in conveyor-49
Ichp -clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north south sides of stacker-ii and reclaimer-ii machine travel path in conveyor-54.
Ichp -clearing the slided and spilled coal along the walkways over below deck sheets, between the track rails and outside the track rails both north south sides of stacker-ii and reclaimer-ii machine travel path in conveyor-54.
Hiring of one number 180 mt capacity crane for removal of the hydraulic luff cylinders from stacker cum reclaimer i equipment at eq i terminal of vpa and install the same after completion of its repair work on shift wise basis including fuel.
Hiring of one no.180mt capacity crane for removal of hydraulic luff cylinders from stacker cum reclaimer i at eqi terminal of vpa and install the same after completion of its repair work on shift wise basis, including fuel and operation for 6 shifts.
Plc cards processor memory and all other cards other than
Plc cards processor memory and all other cards other thani o cards of stacker reclaimer reclaimer.
Ktpp
Flexible epr power and control cables for stacker cum reclaimer
Imer vfd drive for stage-1 chp at ntpc barh
Procurement of stacker-reclaimer vfd drive for stage-1 chp at ntpc barh
🏭 NTPC Limited RFP for Stacker-Reclaimer VFD Drive 🔧 NTPC Limited, a leading Public Sector Undertaking, is seeking proposals for the procurement of an Inverter Duty Motor (VFD drive) for the stage-1 Coal Handling Plant (CHP) at its Barh Super Thermal Power Plant. 📅 Proposal Submission Deadline: April 25, 2024, 12:50 PM (IST) This RFP is for the supply of a VFD drive that will be used in the stacker-reclaimer system, a critical component of the coal handling operations. Interested vendors should submit detailed proposals, including technical specifications, compliance with industry standards, and competitive pricing. Keywords: NTPC Limited, VFD Drive, Stacker-Reclaimer, Coal Handling Plant, RFP, Public Sector Undertaking, Power Plant Equipment, Inverter Duty Motor
Dr.nttps
Supply of input pair gears of stacker / reclaimer ii bucket wheel gear box
Tn-sc-proc-195
Requirement of various types of hydraulic pumps for wagon tipplers, wheel chock, side arm charger, reclaimer and stacker cum reclaimer at chp, ssctpp, suratgarh
Tggenco
Ktps vii stage-chp-mm-painting of stacker cum reclaimer ii in coal handling plant
Need support responding to this opportunity?
Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.
Get Opportunity Matching Supportof your Industry type