Results for: Rainwater Harvesting
Find the latest Rainwater Harvesting tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Rainwater Harvesting e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.
M/o completed scheme of nazul a/c-ii under south zone.sh-redevelopment and cleaning/desilting of existing rainwater harvesting and painting of kerb stone at 3024 ews housing scheme complex at a-14 kalkaji extension.
M/o completed scheme of nazul a/c-ii under south zone.sh-redevelopment and cleaning/desilting of existing rainwater harvesting and painting of kerb stone at 3024 ews housing scheme complex at a-14 kalkaji extension.
Request for proposal from empanelled wrd consultants for preparation of dpr of protection and management of flood plain zone and assessment of ground water recharging rainwater harvesting structure and regulation of environmental flow within the town
Request for proposal from empanelled wrd consultants for preparation of dpr of protection and management of flood plain zone and assessment of ground water recharging rainwater harvesting structure and regulation of environmental flow within the town
🏞️ RFP: Flood Plain Zone Management and Environmental Flow Regulation 🌊 The Water Resources Department (WRD) EinC Major-Med n Minor, under the State Government and Union Territories, has issued a Request for Proposal (RFP) to empanelled WRD Consultants. The objective is to prepare a Detailed Project Report (DPR) for the protection and management of the floodplain zone, assessment of groundwater recharging rainwater harvesting structures, and the regulation of environmental flow within the town of RANCHI. 📅 Proposal Submission Deadline: April 8, 2024, 4:00 PM Interested consultants must submit an Earnest Money Deposit (EMD) of INR 100,000 with their proposals. This initiative is a critical step towards sustainable water resource management and environmental conservation. Keywords: RFP, WRD, Empanelled Consultants, DPR, Flood Plain Management, Groundwater Recharge, Environmental Flow Regulation, Water Resources, RANCHI, State Govt. and UT, Sustainable Management
Refurbishing physical health infrastructure such as construction of bmw storage with compound wall, mortuary, garbage area, rainwater harvesting structure, fitting and fixing of sign boards and painting to indoor, outdoor and eye ward building with f
Civil, ei and ph
Construction of (block-3) science block (ground floor and first floor of govt. degree college at sarahan distt. sirmour h.p (sh- construction of civil work, ws and si rainwater harvesting tank , septic tank , soak pit etc.)
Construction of (block-3) science block (ground floor and first floor of govt. degree college at sarahan distt. sirmour h.p (sh- construction of civil work, ws and si rainwater harvesting tank , septic tank , soak pit etc.)
Cunstruction of water harvesting structure for conservation of rainwater adjoined area of pratapbandh, alwar
Cunstruction of water harvesting structure for conservation of rainwater adjoined area of pratapbandh, alwar
Supply, installation and commisioning of rooftop rainwater harvesting underground tank with complete fitting and with all accessories with isi made pipes, filter and underground polymer heavy duty water tank for 32 villages of palwal and hathin block
Rainwater will be stored in the undeerground tankks and water will be used for drinking.
Upply, installation and commisioning of rooftop rainwater harvesting underground tank with complete fitting and with all accessories with isi made pipes, filter and underground polymer heavy duty water tank for 37 villages of hodal and hassanpur bloc
Rainwater will be used to store in the tank and will be used for drinking purposes.
Construction of 03 nos. of rainwater harvesting cum groundwater recharge structures to be installed on rooftop of public buildings rajkiya madhya vidhalay, sirka nav prathmik vidhalay, chanak basti and anganbadi kendra, kauwabera as a part of ncrap
Construction of 03 nos. of rainwater harvesting cum groundwater recharge structures to be installed on rooftop of public buildings rajkiya madhya vidhalay, sirka nav prathmik vidhalay, chanak basti and anganbadi kendra, kauwabera as a part of ncrap
Estimate for construction of 18 nos 50 cum capacities modular rainwater harvesting systems of using polypropylene block structure and 400 gsm geotextile sheet at various parks in palam vihar area under ward no. - 04, zone-iii, gurugram
Estimate for construction of 18 nos 50 cum capacities modular rainwater harvesting systems of using polypropylene block structure and 400 gsm geotextile sheet at various parks in palam vihar area under ward no. - 04, zone-iii, gurugram
1)construction of hand wash station in z.p. school 2) repairs to anganwadi 3)repairs to grampanchayat office 4)construction of rcc gate 5)repairs to anganwadi 6)providing rainwater harvesting arrangement to government buildings at.village talkhed
1)construction of hand wash station in z.p. school 2) repairs to anganwadi 3)repairs to grampanchayat office 4)construction of rcc gate 5)repairs to anganwadi 6)providing rainwater harvesting arrangement to government buildings at.village talkhed
Need support responding to this opportunity?
Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.
Get Opportunity Matching Supportof your Industry type