Results for: Power Plant Installation

2,567 tenders

Find the latest Power Plant Installation tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Power Plant Installation e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - thermal power station sikka work of complete overhauling of cw pump and cw makeup pump of unit no 3 and 4 on as and when required basis at sikka tps as per buyer added..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - thermal power station sikka work of complete overhauling of cw pump and cw makeup pump of unit no 3 and 4 on as and when required basis at sikka tps as per buyer added..

Organisation: Gujarat State Electricity Corporation Limited (GSECL) Vadodara | Energy and Petro Chemicals Department Gujarat
Start Date: October 12, 2026 22:29
Read more
Due Date: 11 days left

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 220kv s/s moradabad replacement work of jack bus made up single acsr zebra conductor to twin acsr moose conductor of 220 kv moradabad amroha line and repairing and ov..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 220kv s/s moradabad replacement work of jack bus made up single acsr zebra conductor to twin acsr moose conductor of 220 kv moradabad amroha line and repairing and ov..

Organisation: Uttar Pradesh Power Corporation Limited (UPPCL) | Energy Department Uttar Pradesh
Start Date: October 15, 2026 21:36
Read more
Due Date: 4 days left

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - the work to relaying and sagging reinstallationof 33 11 kv lt lines fallen due to natural disaster heavy strom at 33 11 kv substation under edsd iii in edd iii sasn..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - the work to relaying and sagging reinstallationof 33 11 kv lt lines fallen due to natural disaster heavy strom at 33 11 kv substation under edsd iii in edd iii sasn..

Organisation: Uttar Pradesh Power Corporation Limited (UPPCL) | Energy Department Uttar Pradesh
Start Date: October 16, 2026 23:42
Read more
Due Date: 11 days left

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - the work to relaying and sagging reinstallationof 33 11 kv lt lines fallen due to natural disaster heavy strom at 33 11 kv substation under edsd iv in edd iii sasni..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - the work to relaying and sagging reinstallationof 33 11 kv lt lines fallen due to natural disaster heavy strom at 33 11 kv substation under edsd iv in edd iii sasni..

Organisation: Uttar Pradesh Power Corporation Limited (UPPCL) | Energy Department Uttar Pradesh
Start Date: October 16, 2026 23:50
Read more
Due Date: 11 days left

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - the work to relaying and sagging reinstallationof 33 11 kv lt lines fallen due to natural disaster heavy strom at 33 11 kv substation s under edsd i in edd iii sasni h..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - the work to relaying and sagging reinstallationof 33 11 kv lt lines fallen due to natural disaster heavy strom at 33 11 kv substation s under edsd i in edd iii sasni h..

Organisation: Uttar Pradesh Power Corporation Limited (UPPCL) | Energy Department Uttar Pradesh
Start Date: October 16, 2026 22:47
Read more
Due Date: 11 days left

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - the work to relaying and resagging reinstallation of 33 11 kv lt lines fallen due to natural disaster heavy strom at 33 11 kv substation s under edsd ii in edd iii sasn..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - the work to relaying and resagging reinstallation of 33 11 kv lt lines fallen due to natural disaster heavy strom at 33 11 kv substation s under edsd ii in edd iii sasn..

Organisation: Uttar Pradesh Power Corporation Limited (UPPCL) | Energy Department Uttar Pradesh
Start Date: October 17, 2026 00:16
Read more
Due Date: 11 days left

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - the work of 11 kv lt line strengthning and other associate work under o and m m and r scheme at various place in edsd sikandrarao in edd sasni hathras electrical syst..

Repair, maintenance, and installation of plant/ systems/equipments (version 2) - the work of 11 kv lt line strengthning and other associate work under o and m m and r scheme at various place in edsd sikandrarao in edd sasni hathras electrical syst..

Organisation: Uttar Pradesh Power Corporation Limited (UPPCL) | Energy Department Uttar Pradesh
Start Date: October 17, 2026 00:46
Read more
Due Date: 12 days left

Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally

Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally

Organisation: TELANGANA POWER GENERATION CORPORATION LIMITED-CE OM SLBHES SRISAILAM
Start Date: September 16, 2026 21:00
Place: Telangana
Read more
Due Date: 6 days left

Design, construction and commissioning of peb sheds, structures, buildings, water supply arrangement, drainage, sewerage, fire fighting works, road works, track works, traversers, shower testing arrangements, static and oh water tanks, tubewells, parking facilities, boundary wall/fencing, eot cranes, supply installation and commissioning of machinery and plant, electric substations, and power supply arrangements, general electrical works, associated telecom & it works etc. i.e. including a

Design, construction and commissioning of peb sheds, structures, buildings, water supply arrangement, drainage, sewerage, fire fighting works, road works, track works, traversers, shower testing arrangements, static and oh water tanks, tubewells, parking facilities, boundary wall/fencing, eot cranes, supply installation and commissioning of machinery and plant, electric substations, and power supply arrangements, general electrical works, associated telecom & it works etc. i.e. including a

Organisation: Ministry of Railways
Start Date: September 19, 2026 02:37
Read more
Due Date: 89 days left

Nit no. wbsedcl/spgd/ jungle sundari karmanagari ii/solar pv and bess project /2026-27/nit-89 date 12.10.2026

Design, engineering, procurement, supply, installation, construction, testing and commissioning incl warrantee obligation, o and m for 12 yr of a 50 mw ac solar pv power plant and 10 mw/ 40 mwh bess located at jungle sundari, purulia district, wb

Tender EMD: 5 Crore
Organisation: WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | SOLAR POWER GENERATION DEPT.
Start Date: October 12, 2026 21:30
Place: West bengal, raghunathpur, purulia,west bengal
Read more
Due Date: 26 days left

Get new Power Plant Installation tenders

Tell us what you supply or do. We'll send you matching tenders and call you about them.

Free tender checklists for your industry →

Can't meet a tender's eligibility alone? Find a JV or local partner →

Need support responding to this opportunity?

Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.

Get Opportunity Matching Support